Procedure of verification of status of CGP, 2024
- Section 9 Captive Generation… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document
Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
Draft- Illustration… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document