TSERC · Telangana State Electricity Regulatory Commission
Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
Draft Procedure for verification of captive status of such generating plants, where captive generating plant and its captive user(s) are located in the state of Telangana:
Draft procedureReleased with the notice dated 30 Sep 2024Procds. No. / TGERC / E – 711594 / SECY / / 2024 dated .08.2024
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Telangana Electricity Regulatory Commission (TGERC) issues a draft procedure for verifying whether a generating plant and its users qualify as a captive generating plant (CGP) and captive user(s) where both are located in Telangana (p1–2). It is stated to be made pursuant to clause 7 of the TGERC Terms and Conditions of Open Access Regulation, 2024 (Regulation No. 1 of 2024), notified on 18.03.2024, and it recites the Electricity Act, 2003 and Electricity Rules, 2005 as the governing framework (p1–2).
The order at p1 records the Commission's decision to provide a detailed procedure under the open access regulation. The procedure sets the objective and applicability: claims for verification of consumption and equity shareholding criteria are to be routed through the distribution licensee; distribution licensees must submit a consolidated report to the Commission every year before 30 June (p2, p8).
It defines key terms including generating unit (with separate treatment for solar PV, wind and renewable hybrid units), energy storage system, renewable hybrid generating station, subsidiary company, open access regulation and year (p2–3). It then extracts the statutory provisions on captive generation, including Electricity Act sections 2(8), 2(28), 2(30) and 9 and Rule 3 of the Electricity Rules, 2005 with the ownership and consumption tests and the SPV illustration (p3–7).
The procedure designates the Commission as verifying authority and requires the distribution licensee to collect CGP data, place it before the Commission, and allow clarifications; if the CGP does not respond, the authority may decide on available data (p8). General conditions cover direct or storage-mediated consumption, subsidiary/holding company consumption, changes in ownership, the 26% ownership and 51% consumption tests, cooperative societies, SPV units and the 10% proportional-consumption variation (p8–10).
It sets out the annual verification process: application to the distribution licensee, affidavit by 30 June in Schedule I, consolidated report, and communication of status within two months, with assistance from STU, SLDC and the distribution licensee (p10). Detailed criteria and required documents follow for ownership by companies, cooperative societies, AoP and SPV (p10–13) and for consumption, including treatment of technical losses, auxiliary consumption, open access energy and the first-year start date (p13–15).
The procedure then covers cessation of CGP status, default by a shareholder, and metering requirements for each CGP unit (p15–16). Schedules and formats provide the affidavit and certificates/tables for ownership and consumption (p17–30).
Read with this
The regulation
- Dated 15 Mar 2024Terms and Conditions of Open Access Regulation, 2024
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
- Dated 30 Nov 2024Procedure of verification of status of CGP, 2024
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Dated 30 Sep 2024Public notice: Draft Procedure for Verification of Captive Status of Generating Plants in Telangana — Public Notice
Earlier drafts
- Dated 15 Nov 2025Terms and Conditions of Open Access Regulations, 2024 — First Amendment, 2025 — Draft
- Dated 15 Nov 2025Public notice: Terms and Conditions of Open Access Regulation, 2024 — First Amendment — Public Notice — Draft
One more document belongs here and is not on Voltaic: a draft or notice on a draft.
Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.