Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Renewable Power Purchase Obligation Regulations, 2017 (FY 2017-18 to 2021-22) — Statement of Reasons

APERC Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy/Renewable Energy Certificates) Regulations-2017 – For the years from 2017-18 to 2021-22 – Reg.

Statement of reasonsDated 31 Mar 2017Commission Proceedings No. 08/2017 dated 31-03-2017

Replaced by Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the RPPO Regulations, 2017.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's Commission Proceedings No. 08/2017 dated 31-03-2017 (p1), recording the Commission's reasoned decisions on objections to the draft Renewable Power Purchase Obligation (RPPO) Regulations-2017 for FY2017-18 to FY2021-22. It is not the regulation text itself; it is the statement of reasons that approves the regulation and directs modifications to the draft (p1, p7–8).

The bulk of the document (pp1–8) deals with the RPPO percentage trajectory. After summarizing stakeholder demands for lower targets, the Commission accepts APPCC's more conservative proposal: non-solar RPO rising from 6% to 10%, solar from 3% to 7%, and total from 9% to 17% over the five years (p3). It rejects the two DISCOMs' separate proposals and the argument that both DISCOMs be treated as one control area, because s.86(1)(e) places the obligation on each distribution licensee (pp7–8).

On hydro, the Commission holds that the consumption base excludes hydro except mini hydel, aligning with the MoP order and NTP 2016 while preserving promotion of solar and wind (pp8–10). It retains the REC mechanism, keeps APSLDC as State Agency, and deletes draft clause 6 on accreditation/registration so that CERC REC Regulations 2010 as amended apply, with state-jurisdiction provisions surviving (pp10–12).

It allows DISCOM RPPO offset for various RE purchases where no REC is claimed, with safeguards against double counting, and addresses net-metered rooftop solar depending on whether the consumer is an obligated entity (pp12–14). It retains existing monitoring, default and penalty provisions, accepting only web-based verification of RECs by SLDC (pp14–15).

Other sections clarify fund use, obligated entities, procurement and sale of surplus RE, third-party PWPA consumers, self-retention and carry-forward of RECs, waste-heat recovery exemption, waste-to-energy, captive RE metering instead of mandatory synchronization, competitive bidding, coal-use prohibition in RE plants, and energy-efficiency alternatives (pp15–21). The annexure lists stakeholders who filed suggestions and attended the public hearing (p22).

Standard name
RPO Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Net metering

Read with this

The regulation

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document