APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022
APERC RENEWABLE POWER PURCHASE OBLIGATION (COMPLIANCE BY PURCHASE OF RENEWABLE ENERGY / RENEWABLE ENERGY CERTIFICATES) REGULATIONS, 2022.
RegulationDated 29 Sep 2022Published in the Gazette 29 Sep 2022REGULATION No.5 OF 2022 dated 29-09-2022
1 amendment to it is on Voltaic, dated 14 Jul 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
Page 1 is the gazette cover of the APERC Renewable Power Purchase Obligation (Compliance by Purchase of Renewable Energy / Renewable Energy Certificates) Regulations, 2022 — Regulation No. 5 of 2022 — issued by the Andhra Pradesh Electricity Regulatory Commission, Hyderabad, under letter Lr.No.APERC/Secy/F.No.S-19 (Vol.II)/D.No.598/2022 dated 29-09-2022, and published in Part II Extraordinary of the Andhra Pradesh Gazette (No. 1254, Amaravati, Thursday, September 29, 2022, G.1023) (p1). Page 12 carries the authentication of K. Raja Bapaiah, Commission Secretary (I/c) (p12).
The operative regulations are not in the supplied text: pages 2–11 are missing. From the title alone, the instrument governs how obligated entities satisfy their renewable power purchase obligation by purchasing renewable energy or renewable energy certificates. Applicability, RPO trajectories, compliance and enforcement mechanics, and any commencement provision cannot be verified from the pages available.
Read with this
Amendments and corrections
Commencement notices and reasons
Procedures and orders made under it
Consolidated copies, for reference (1)
Earlier drafts
- Dated 17 Mar 2022Renewable Power Purchase Obligation Regulations, 2022
- Dated 17 Mar 2022Public notice: Renewable Power Purchase Obligation Regulation, 2022 — Public Notice on draft
- Dated 5 Jun 2023Renewable Power Purchase Obligation Regulations, 2022 — First Amendment — Draft
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of APERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.