Skip to content

GERC · Gujarat Electricity Regulatory Commission

Explanatory Memorandum — Draft Amendments to the Licensee's Power to Recover Expenditure and Miscellaneous Charges Regulations, 2005

Explanatory Memorandum

Explanatory memorandum to a draftDated 19 Feb 2022

Draft

The draft has since been finalised as the Security Deposit (Third Amendment) Regulations, 2023.

Explanatory memorandum to the Security Deposit (Third Amendment) Regulations, 2022 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Gujarat Electricity Regulatory Commission (GERC) explanatory memorandum setting out why two sets of changes are proposed to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005, and reproducing the existing and the proposed text of the affected clauses. It is a pre-consultation working document: the Commission records its decision to amend the Principal Regulations "as narrated in the Draft Regulations attached herewith" (p1).

Part I (pp1–3) concerns the definition of "Temporary Service" in clause 2.1(xvii). It sets out the Ministry of Power's definition of "temporary connection" in Rule 2(1)(m) of the Electricity (Rights of Consumers) Rules, 2020 alongside the existing GERC definition, and explains that the 2005 Regulations and the GERC Supply Code, 2015 set different initial periods for temporary supply, so the two GERC instruments should be aligned. The proposed revised definition follows (p2–3).

Part II (pp3–5) revises clauses 7(vi) and 7(vii) so that an applicant recovers any excess deposited against a demand note. Refunds are to be made by account payee cheque or electronic mode within a fixed period of energisation, with interest at the Late Payment Surcharge rate of the prevailing tariff order if delayed, and information requests are to be answered within a stated time; amounts still owed by the applicant are to be paid within a stated period of demand and, failing that, debited to the next electricity bill (p4–5).

The memorandum states no date of issue or commencement; the changes would take effect through the draft regulations it accompanies.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
New connections and load changes, Connection and miscellaneous charges, Billing and payment

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 4 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document