GERC · Gujarat Electricity Regulatory Commission
Security Deposit Regulations, 2005 — First Amendment, 2010
Gujarat Electricity Regulatory Commission (Security Deposit) (First Amendment) Regulations, 2010
AmendmentDated 2 Aug 2010Published in the Gazette 21 Aug 2010Notification No. 5 of 2010 dated 2nd August, 2010
Amends the Security Deposit Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short gazette notification by which the Gujarat Electricity Regulatory Commission amends its 2005 Security Deposit Regulations. It is issued under Section 47 and Section 181(2)(v) and (w) of the Electricity Act, 2003, read with Clause 5.3 of the principal 2005 regulations (p1).
Clause 1 gives the title, extends the amendment to the whole of Gujarat and makes it applicable to all distribution licensees within their licensed areas, and brings it into force on the date of publication in the Gujarat Government Gazette — here printed as 21 August 2010 (p1). The signature block is dated 2 August 2010 at Ahmedabad (p2).
The only substantive change is Clause 2, which adds wording at the end of Clause 4.3 of the principal regulations (p1–2). The added text gives consumers with a contract demand of 1 MVA or more the option of furnishing their security deposit as an irrevocable bank guarantee, issued by a nationalised or scheduled commercial bank, valid initially for two years with a further three-month claim period, and places the duty on the consumer to keep it valid and renew it at least two months before expiry (p2). Nothing else in the 2005 regulations is touched.
Read with this
The regulation
- Dated 30 Mar 2005Security Deposit Regulations, 2005
Amendments and corrections
- Dated 14 Jul 2015Security Deposit (Second Amendment) Regulations, 2015
- Dated 5 Dec 2023Security Deposit (Third Amendment) Regulations, 2023
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 19 Feb 2022Security Deposit (Third Amendment) Regulations, 2022 — Draft
- Dated 19 Feb 2022Explanatory memorandum: Explanatory Memorandum — Draft Amendments to the Licensee's Power to Recover Expenditure and Miscellaneous Charges Regulations, 2005
4 more documents belong here and are not on Voltaic: 4 copies in another language.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.