Skip to content

GERC · Gujarat Electricity Regulatory Commission

Security Deposit (Second Amendment) Regulations, 2014 — Draft

Gujarat Electricity Regulatory Commission (Security Deposit) (Second Amendment) Regulations, 2014

Draft amendmentDated 17 Feb 2014

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft text of the Gujarat Electricity Regulatory Commission's second amendment to its 2005 Security Deposit Regulations, issued from Gandhinagar and signed by the Commission's Secretary on 17/02/2014 (p4). It is a short, four-clause instrument that rewrites how much security deposit a distribution licensee may hold from a consumer, how that amount is reviewed, and how consumers can avoid or spread the deposit.

Clause 1 gives the short title, extends the regulations to the whole of Gujarat and to all distribution licensees within their licensed areas, and provides for commencement on the date of publication in the Gujarat Government Gazette — no Gazette date is printed (p1).

Clause 2 substitutes Clause 4.6, setting how often licensees must review the adequacy of a consumer's security deposit, distinguishing HT from LT consumers and tying the review to average consumption over the previous April–March year, subject to the notice periods in Clauses 4.1 and 4.2 (p1).

Clause 3 substitutes Clause 4.9, giving the licensee power to seek an increase or make a reduction after review, and specifying the mechanics: a tolerance band below which no further demand is made, refund of excess by adjustment in the next bill (residual by cheque/DD), and a 30-day notice where extra deposit is due (p1–2).

Clause 4 inserts new Clauses 4.15–4.22: a bank guarantee requirement where the total security deposit exceeds Rs. 10 Lacs (p2); mandatory disclosure of the deposit amount on consumers' bills (p2); separate deposit methodologies for consumers with a captive generating plant on the same premises, for open access consumers, and for those with both (p2–3); an option to pay 90% of the highest recent monthly bill in advance instead of a deposit (p3–4); and payment of an additional deposit through twelve equated monthly instalments, which is not available for new connections or additional load (p4).

Standard name
Security Deposit
Primary topics
Security deposit

Read with this

The regulation

Commencement notices and reasons

Proposed changes (drafts with no final yet)

4 more documents belong here and are not on Voltaic: 4 copies in another language.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document