Summary
Summary written by software. Check the regulator's original before you rely on it.
These are HERC's 2016 guidelines for assessing whether demand side management (DSM) programmes are cost effective and what costs a Distribution Licensee may recover. They are issued under Regulation 6.1(iii) of the HERC (Demand Side Management) Regulations, 2014, and bind Distribution Licensees in Haryana when they formulate a DSM plan, select and prioritise programmes, and prepare programme documents (p1; pp3–5).
Section 1.1 gives the title, commencement and application, including that they apply to Distribution Licensees as provided in their licences (p1). Section 1.2 defines the key terms used in the assessment, such as Benefit/Cost ratio, Cost Effectiveness Index, Cost of Conserved Energy, Capital Recovery Factor, DSM Resource Acquisition and the two discount rates (pp2–3). Section 1.3 reproduces the relevant provisions of the 2014 DSM Regulations, covering guidelines on the DSM process, formulation of the DSM plan, preparation of programme documents, and criteria for programme assessment and approval (pp3–5).
Section 1.4 limits use of the guidelines to DSM activities and especially programmes with significant expected investment (p5). Section 1.5 distinguishes Programme Costs from General Costs and lists major cost codes for DSM programmes (pp5–6). Section 1.6 categorises DSM programmes into five types according to who bears the costs (p7). Section 1.7 sets the assessment criteria: Cost Effectiveness Index for the Distribution Licensee, a demand-versus-supply-side comparison, and Cost of Conserved Energy for participating consumers (pp7–11). Section 1.8 applies approval tests by programme type and deals with approval of General Costs through the ARR (pp11–13). Section 1.9 provides for indicative assessment at the plan stage, Section 1.10 lays down the regulatory approval process, and Section 1.11 gives miscellaneous powers and dispute-resolution routing (pp14–15). Annexure-I lists acronyms (p16).
Read with this
The regulation
- Dated 19 Nov 2014Demand Side Management Regulations, 2014
Procedures and orders made under it
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.