Skip to content

HERC · Haryana Electricity Regulatory Commission

Demand Side Management Regulations, 2014

Haryana Electricity Regulatory Commission (Demand Side Management) Regulations, 2014

RegulationDated 19 Nov 2014HERC/ 30 / 2014 dated The 19th November, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on herc.org.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Haryana Electricity Regulatory Commission's principal regulation for demand side management by the State's distribution licensees, notified on 19 November 2014 as Regulation No. HERC/30/2014 under sections 61, 86 and 181 of the Electricity Act, 2003 (p1, p5). It comes into force on publication in the Haryana Government Gazette (extraordinary); the Gazette date itself is not printed (p5).

The first five pages are a Statement of Objects and Reasons: it explains why the Commission wants DSM, records that a draft was hosted for comment and a hearing held on 15.09.2014, and sets out the objections received from a consultant, HAREDA and the distribution licensee UHBVN together with the Commission's clause-by-clause responses — including the decision to include the State Action Plan on Climate Change in the DSM objectives and to decline a role for EESL on the Advisory Committee (p2–5).

The operative text runs from Chapter I: short title, commencement, application to all distribution licensees in their supply areas, and a set of DSM-specific definitions — baseline data, DSM Cell, DSM measure, DSM resource acquisition, ESCO, gross saving, and evaluation/measurement/verification (p5–7). Chapter II sets the DSM objectives to be pursued, the requirement for each licensee to assess DSM technical potential before every MYT control period (first assessment within six months of notification), the Commission's power to prescribe DSM targets, and the Commission's power to issue process guidelines (p8–10). Chapter III requires every licensee to constitute a DSM Cell with defined responsibilities and a protected two-year tenure for its staff, and establishes a DSM Advisory Committee chaired by a Commission Member to advise the Commission (p10–13). Chapter IV covers load and market research and baseline data, expressly saying baseline data is not a precondition for launching initial programmes (p13–14). Chapter V is the operative core: formulation, review and approval of the perspective DSM Plan and rolling annual plans; the programme document that must precede each programme; cost recovery and funding including a capped annual DSM budget within ARR and an optional public benefit charge-based energy conservation fund; monitoring and reporting; evaluation, measurement and verification; completion reports; incentives; and the cost effectiveness criteria (CEI and CCE) against which programmes are judged (p14–21). Chapter VI gives the Commission powers to amend, remove difficulties, issue directions, relax provisions, and resolve disputes under its Conduct of Business Regulations (p21–22).

Standard name
Demand Side Management and Demand Response
Primary topics
Demand-side management and demand response, Losses and loss reduction, ARR and true-up

Read with this

Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on herc.org.in ↗

Report an issue with this document