HERC · Haryana Electricity Regulatory Commission
Evaluation, Measurement and Verification of DSM Programmes Guidelines, 2016
Haryana Electricity Regulatory Commission (Evaluation, Measurement and Verification of DSM Programmes) Guidelines, 2016
GuidelinesDated 28 Jul 2016No. HERC/35/ 2016 dated The 28th July, 2016
Made under the Demand Side Management Regulations, 2014.
Summary
Summary written by software. Check the regulator's original before you rely on it.
These are the Haryana Electricity Regulatory Commission's guidelines for how the savings claimed from Demand Side Management (DSM) programmes are to be evaluated, measured and verified. They were notified on 28 July 2016 as No. HERC/35/2016 and are issued under Regulation 6.1(iv) of the HERC (Demand Side Management) Regulations, 2014. They bind Distribution Licensees, the Commission itself and third-party evaluators empanelled by the Commission, and they come into force on publication with no sunset, remaining in force until modified (p1).
The opening sections set the short title and scope, define the working vocabulary of DSM evaluation — baseline and reporting-period energy use, adjustments, gross savings, DSM measure, E,M&V plan and Third Party Evaluator — and reproduce, as background, the relevant provisions of the parent DSM Regulations (Regulation 17 on E,M&V) requiring licensees to prepare a plan and to supply data to the Commission or its appointee (p1–3).
The middle of the document is the procedure. It lays out the sequence the Commission expects: the licensee prepares an E,M&V plan for each programme and files it with the programme document for approval; the Commission empanels Third Party Evaluators; the licensee selects one through competitive bidding at its own cost; the evaluator reports; the DSM Advisory Committee reviews; and the Commission may seek clarification and issue directions. It then specifies what an E,M&V plan must contain — programme overview, objectives, evaluation cycle and indicators, detailed methodology, sampling, treatment of uncertainty, timelines, budget and reporting format — with the Commission approving the plan before the programme is implemented (p3–5).
On methodology it specifies that evaluation measures gross energy and demand savings by comparing reporting-period use with baseline use, adjusted for independent variables, and permits three approaches: deemed savings, Measurement & Verification following the four IPMVP options, and large-scale data analysis, which carries its own qualifying conditions for programme size and data availability (p5–8). A separate section gives the mechanism for choosing and freezing the approach, and another sets the empanelment criteria for Third Party Evaluators together with a conflict-of-interest bar (p8–9).
The E,M&V report's required contents are prescribed, and the Commission states it will consider E,M&V results when approving large or future DSM programmes (p9–10). Miscellaneous powers to amend, remove difficulty, give directions, relax provisions and settle disputes are retained by the Commission (p10). Annexure-I is a short acronym list (p11).
Read with this
The regulation
- Dated 19 Nov 2014Demand Side Management Regulations, 2014
Procedures and orders made under it
- Dated 28 Jul 2016Cost Effectiveness Assessment of DSM Programmes Guidelines, 2016
Voltaic last read HERC's website for final documents on 24 Nov 2026 (2 pages). A document HERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.