Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

State Grid Code Regulations, 2016 — First Amendment, 2022

Uttarakhand Electricity Regulatory Commission (State Grid Code) (First Amendment) Regulations, 2022

AmendmentDated 8 Jun 2022No. F-9/14(i)/RG/UERC/2022/340 dated June 08, 2022

Amends the State Grid Code Regulations, 2016.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A four-page notification by which the Uttarakhand Electricity Regulatory Commission amends its 2016 State Grid Code. Clause 1 gives the short title and ties commencement to the date of gazette notification (p1). Clause 2 replaces sub-regulation (22) of Regulation 6.2, substituting a table of permissible grid voltage ranges at every nominal voltage level from 765 kV down to 33 kV (p1).

Clause 3 is the bulk of the document and makes nine changes to Regulation 7.5, the scheduling regulation. Two scheduling cut-off times are moved earlier in the morning (p1). The rules on when a revised schedule takes effect are rewritten so that, across forced outages, evacuation bottlenecks, two-part-tariff stations, short-term bilateral sales, the SLDC's own revisions and wind/solar revisions, a revision advised in an odd 15-minute block takes effect from the 7th time block and one advised in an even block from the 8th, counted from the block in which the revision was advised or declared (p2–4). The notification defines odd and even time blocks and gives a worked illustration (p2). It also covers deemed revision of generation and drawals during an evacuation bottleneck (p2), forced outage of units above 30 MW selling under short-term bilateral transactions — with continued transmission charges for two days and a proviso tying revision to the source being named in the open access application (p3–4) — the SLDC's power to revise schedules on its own for better system operation (p4), and revision rights for wind and solar generators that are State constituents, subject to a daily cap (p4).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Power quality

Read with this

The regulation

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document