Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

State Grid Code Regulations, 2016 — Statement of Objects and Reasons

State Grid Code Regulations, 2016 (SoR)

Statement of reasonsDate not stated

The commission's reasons for the State Grid Code Regulations, 2016 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Objects and Reasons (SoR) for the Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016, not the Grid Code itself. Page 1 sets out the statutory logic: section 86(1)(h) of the Electricity Act, 2003 requires the State Commission to specify a State Grid Code consistent with the Central Grid Code under section 79(1)(h). It recalls that UERC's 2007 State Grid Code came into force on 28.04.2007 and that CERC replaced the 2006 IEGC with the 2010 IEGC, in force from 03.05.2010, which was amended four times. UERC then issued the draft 2016 Regulations, received comments by 31.08.2016 (extended to 31.09.2016 as printed), and held a public hearing on 04.10.2016.

Pages 2–28 record stakeholder comments and the Commission's reasoning. They cover whether to add definitions such as Backing Down, Captive Power Plant, CEA Grid Standards, Central Generating Station, Connection Conditions, Grid Disturbance, Planned Outage and RTU; data submission to STU, including one-time data formats and annual updates; application and connection procedures for the intra-state transmission system and embedded generating units; protection-system and relay-coordination duties; conditions for deliberate grid isolation; restricted governor mode and peak-up capability for thermal and hydro units; voltage operating ranges and harmonic-distortion limits; scheduling and despatch timelines; mis-declaration penalties; and reactive-power/voltage charges. PTCUL/SLDC's proposed State Operational Coordination Committee was rejected as encroaching on existing bodies, and its proposed Data Code was not adopted as a separate chapter, though data-related responsibility was added to SLDC's functions (pp24–28).

Annexures I and II list the four stakeholders who commented (PTCUL, SLDC, UPCL, UJVN Ltd.) and the twelve participants at the public hearing (pp29–30). The document records what the Commission accepted or rejected and why, but it does not print the final regulation text or a notification/gazette date.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Power quality

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document