Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

State Grid Code Regulations, 2016

Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016

RegulationDated 19 Dec 2016No. F-(9)14/RG/UERC/2016/1427 dated December 19, 2016

1 amendment to it is on Voltaic, dated 8 Jun 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 25 of 69. Check the regulator's original before you rely on it.

The document is the Uttarakhand Electricity Regulatory Commission (State Grid Code) Regulations, 2016, notified on December 19, 2016 (p1). It is the State's principal grid code: a single set of technical and commercial rules for parties connected to or using the intra-State transmission system (IaSTS), including SLDC. It replaces the 2007 State Grid Code on commencement, which is tied to publication in the official gazette (p1). For inter-State transmission it says the CERC (Indian Electricity Grid Code) Regulations, 2010 apply, and open access users connected to the IaSTS must also comply with the UERC (Terms and Conditions of Intra-State Open Access) Regulations, 2015 (pp1–2).

Chapter 1 is preliminary. It sets the short title, extent over Uttarakhand, scope, objectives and an extensive definitions list (pp1–7). Definitions cover grid-operation concepts, users and constituents, planning and connection terms, open access products, settlement accounts and technical devices. The chapter ends with a ten-chapter structure map (pp8–9), useful because the supplied excerpt covers only Chapters 1–5: later chapters are Operating Code, Scheduling & Despatch Code, Metering Code, Safety and Management of SGC.

Chapter 2 is general. It allocates compliance-monitoring duties: STU monitors Chapters 4, 5 and 6; SLDC monitors Chapters 6 and 7; persistent non-compliance is reported to the Commission; SLDC directions bind licensees and users, with disputes referred to the Commission while the direction stands; persistent failure can lead to disconnection (pp10–11). It also sets the review/revision route through the Grid Coordination Committee and requires STU to keep the Code, with amendments, on its website (p11).

Chapter 3 assigns roles and functions. PTCUL is identified as the State Transmission Utility, and the chapter lists STU and SLDC statutory functions, ALDC support duties, the GCC's composition, chairperson/convenor and meeting requirements, the duties of SLDC and substation shift in-charges, and the distribution licensee's responsibility for long-term load forecasts (pp12–16).

Chapter 4 is the Planning Code for intra-State transmission. It states planning philosophy, coordination duties, planning criteria for contingency outages and redundancy, reactive-power planning, planning data exchange, and the annual transmission plan submission and publication obligation (pp17–20). Chapter 5 is the Connection Code. It incorporates CEA technical, construction and safety standards; sets the application and approval procedure for new or modified connections; specifies what a Connection Agreement must contain; and covers EHV equipment, fault-clearance times, protection coordination, reactive compensation responsibilities, data/communication facilities, recording instruments, Site Responsibility Schedules and Single Line Diagrams (pp21–25).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Connectivity and GNA, Network planning and investment

Read with this

Amendments and corrections

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 2 copies in another language.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document