Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering, 2018 — Second Amendment, 2024 — Draft
Bihar Electricity Regulatory Commission (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) (Second Amendment) Regulation, 2024
Draft amendmentDated 8 Oct 2026Notice No. 12 dated 08.10.2026
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a Bihar Electricity Regulatory Commission public notice (Notice No. 12, dated 08.10.2026, p1) opening Suo-Motu Proceedings No. 47/2026 and inviting comments, suggestions and objections from the public and stakeholders on a draft amendment to the Commission's rooftop solar net/gross metering regulations. Written comments are due by 28.10.2026, and a public hearing is scheduled for 3.11.2026 at 11:30 A.M. (p1). The draft regulations themselves are reproduced at pages 2–3.
The draft amends the BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2018 (the "Principal Regulations"). Clause 1 supplies the short title, commencement (from the date of notification in the Official Gazette) and extent (the whole State of Bihar) (p2). Clause 2 substitutes Clause 3.3, setting the minimum and maximum size of a solar system an eligible consumer may install, tying the net-metering ceiling to the lower of the capacity cap and the sanctioned/contracted load, permitting gross metering up to the sanctioned load, and preserving the State Government's right to take up larger rooftop solar projects through alternative mechanisms (p2). Clause 3 substitutes Clause 6.2, making the maximum permitted capacity depend on the consumer's eligibility for grid interconnection while restating the same net/gross metering capacity test (pp2–3). Clause 4 replaces the second proviso to Clause 8.1, governing the rate at which a distribution licensee must pay for excess electricity injected under net metering that remains unadjusted at the close of the financial-year settlement period (p3).
Read with this
The regulation
- Dated 2 Apr 2018Rooftop Solar Net and Gross Metering Regulations, 2018
Earlier drafts
Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.