BERC · Bihar Electricity Regulatory Commission

Rooftop Solar Net and Gross Metering Regulations, 2017 — Consultative Paper — Draft

Consultative Paper on the proposal for BERC (Rooftop Solar Grid Interactive Systems Based on Net and gross Metering) Regulations, 2017 for inviting comments/suggestions from general public and stakeholders.

Draft regulationDated 1 Dec 2017

Draft

A proposal that has since been finalised as the Rooftop Solar Net and Gross Metering Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on berc.co.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a consultation package issued by the Bihar Electricity Regulatory Commission on 1 December 2017 (p1). The public notice starts a suo-motu proceeding and invites comments, suggestions and objections from the public and stakeholders on the draft BERC (Rooftop Solar Grid Interactive Systems Based on Net and Gross Metering) Regulations, 2017; comments are due by 05.01.2018 and the Commission will hear the matter on 9 January 2018 (p1). The same notice also lists a separate draft regulation on capital investment, but only the rooftop solar consultative paper and draft are in this document.

The consultative paper (pp2–3) explains why the Commission wants to replace the 2015 net-metering-only regulations. It notes that the Bihar New and Renewable Energy Sources Policy, 2017 introduces gross metering and third-party sale alongside net metering, and that the existing 2015 regulations may not accommodate these modes. The paper therefore proposes to repeal and replace the 2015 regulations, drawing on section 86(1)(e) of the Electricity Act and clause 7.2 of the 2017 state policy, and invites stakeholder input.

The annexed draft regulations (pp4–14) set out the proposed framework. After the short title, extent and commencement clause (p4), they define key terms such as eligible consumer, net and gross metering, rooftop PV solar system, third party owner and solar meter (pp4–7). The scope applies to distribution licensees and eligible consumers in Bihar, with capacity limits linked to the consumer's sanctioned load (p7). General principles require non-discriminatory, first-come-first-serve metering and rule out simultaneous net and gross metering or banking (p8). Capacity targets for distribution licensees impose annual and transformer-level caps (pp8–9). The draft then addresses eligible consumer capacity (p9), grid interconnection and safety standards (pp9–10), energy accounting and settlement for both net and gross metering, including carry-forward rules and dispute resolution (pp10–12), solar RPO treatment (p12), open access for rooftop producers (p12), REC eligibility (p12), metering arrangements (pp12–13), penalties and compensation (pp13–14), and the Commission's powers to direct, remove difficulties, amend and repeal the 2015 regulations (p14).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Metering

Read with this

Voltaic last read BERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document BERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on berc.co.in ↗

Report an issue with this document