KERC · Karnataka Electricity Regulatory Commission
Terms and Conditions for Open Access (OA) Regulations, 2025 — Draft
Karnataka Electricity Regulatory Commission (Terms and Conditions for Open Access (OA)) Regulations, 2025
Draft regulationDated 16 Jan 2025KERC-2-TR-2024-25/1335 dated 16.01.2025
Draft
A proposal that has since been finalised as the Terms and Conditions for Open Access Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft with which the Karnataka Electricity Regulatory Commission proposes to replace its 2004 open access regulations, issued on 16.01.2025 as No. KERC-2-TR-2024-25/1335 (p1). The preamble records that the High Court of Karnataka, by order dated 20.12.2024 in W.P. No. 11235/2024 and connected petitions, struck down both the central Green Energy Open Access Rules, 2022 and KERC's own GEOA Regulations, 2022, and directed the Commission to frame fresh regulations if it wished, guided by the National Electricity Policy and the Tariff Policy; the draft of the GEOA (First Amendment) Regulations, 2024 is accordingly withdrawn, and the Court's interim arrangements on wheeling and banking for existing green energy open access users are recited (p2–3). Objections are invited for 30 days from gazette publication, with a public hearing on 25.02.2025 (p3).
Regulations 1–7 lay the framework: definitions (p4–6); criteria for allowing long-, medium- and short-term access (p6); classification of open access customers by duration of use (p6–7); eligibility, tied to contract demand or sanctioned load thresholds and to captive status (p7–8); the State Load Despatch Centre as State Nodal Agency (p8); treatment of existing open access entities (p8); and allotment priority between distribution licensees and open access customers (p8).
Regulations 8–10 set the procedure — portal-based applications processed against a 'zero date' timeline, with deemed concurrence, deemed grant and deemed approval of the wheeling and banking agreement, processing fees and bank guarantee or letter of credit requirements, cancellation triggers, a separate day-ahead transaction route, and the consequences of non-utilisation, surrender or relinquishment of allocated capacity (p9–14).
Regulations 11–13 deal with money and dispatch order: the heads of open access charges (p14); the formulae and methods for transmission charges (including co-located and non-co-located wind-solar hybrids), wheeling charges read with tariff orders, cross-subsidy surcharge, additional surcharge, banking, standby, losses and other fees (p15–19); and curtailment priority with pro-rata treatment within a category (p19). Regulations 14–21 cover green certificates, dispute resolution, metering, grid and distribution code compliance, collection and disbursement of charges, information posting by SLDC and licensee reporting (p19–21). Regulations 22–26 are administrative: orders and practice directions, removal of difficulties, amendment, interpretation, and repeal of the 2004 Regulations with a saving clause (p21–22). The annexure supplies Forms 1 and 2 for the data used to estimate additional surcharge (p23–24).
Read with this
The regulation
- Dated 26 Mar 2025Terms and Conditions for Open Access Regulations, 2025
Commencement notices and reasons
- Dated 4 Apr 2025Open Access Regulations, 2025 — Statement of Reasons
Earlier drafts
- Dated 16 Jan 2025Terms and Conditions for Open Access (OA) Regulations, 2025 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.