KERC · Karnataka Electricity Regulatory Commission
Terms and Conditions for Open Access (OA) Regulations, 2025 — Draft
Karnataka Electricity Regulatory Commission (Terms and Conditions for Open Access (OA)) Regulations, 2025
Draft regulationDated 16 Jan 2025No. KERC-2-TR-2024-25/1335 dated 16.01.2025
Draft
A proposal that has since been finalised as the Terms and Conditions for Open Access Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission issued this consultation draft on 16.01.2025 (p1). It proposes fresh intra-State open access rules, including for green energy open access, to replace the 2004 OA Regulations. The preamble records that the High Court of Karnataka struck down the central Green Energy Open Access Rules 2022 and KERC's 2022 GEOA Regulations and, by order dated 20.12.2024, told KERC it may frame appropriate regulations or continue the 2004 Regulations; the draft GEOA First Amendment 2024 is withdrawn, and interim wheeling and banking terms are recited (pp1–3). Objections are due within 30 days of Gazette publication and a public hearing is set for 25.02.2025 (p3).
The draft text (pp4–26) names the regulations, proposes commencement on Gazette publication and extends their application to green energy OA applications filed from 13.01.2023 for STOA and 02.01.2023 for LTOA/MTOA. It defines OA, banking, green energy and related terms; sets eligibility (100 kW and above for HT/LT consumers, no load limit for captive consumers), long/medium/short-term categories and system criteria; designates SLDC as State Nodal Agency; and preserves existing arrangements subject to the new regulations (pp4–9).
It then prescribes the application process, timelines, fees, bank guarantee/letter of credit and agreement steps; day-ahead transactions; treatment of non-utilisation; a full set of OA charges with computation methods; curtailment priority; green certificates; dispute resolution; metering and grid-code compliance; collection and reporting duties; and miscellaneous powers. It ends with repeal of the 2004 Regulations with savings, and forms for additional-surcharge data (pp10–28).
Read with this
The regulation
- Dated 26 Mar 2025Terms and Conditions for Open Access Regulations, 2025
Commencement notices and reasons
- Dated 4 Apr 2025Open Access Regulations, 2025 — Statement of Reasons
Earlier drafts
- Dated 16 Jan 2025Terms and Conditions for Open Access (OA) Regulations, 2025 — Draft
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.