Skip to content

KERC · Karnataka Electricity Regulatory Commission

Terms and Conditions for Open Access Regulations, 2025

Karnataka Electricity Regulatory Commission (Terms and Conditions for Open Access) Regulations, 2025

RegulationDated 26 Mar 2025Published in the Gazette 26 Mar 2025No. KERC-2-TR-2024-25/1805 dated 26.03.2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 51. Check the regulator's original before you rely on it.

KERC's 2025 Open Access Regulations replace the 2004 open access framework for intra-State transmission and distribution networks in Karnataka. The preamble (pp1–4) records that the High Court of Karnataka, by order dated 20.12.2024, struck down the Central Green Energy Open Access Rules 2022 and KERC's GEOA Regulations 2022, directed KERC to frame open access regulations independently if it wished, and continued interim wheeling and banking arrangements. KERC consulted on a draft notified on 19.01.2025 and makes these Regulations, which come into force on Gazette publication (p4).

Regulations 1–4 (pp5–9) define the vocabulary and scope. They set load-eligibility thresholds for open access consumers, provide a special aggregation route for public EV charging stations, exempt captive consumers from the load limit, and restrict open access where a generator has a subsisting PPA. Regulation 5 makes SLDC the State Nodal Agency (SNA). Regulations 6–7 preserve existing agreements and policies and set allotment priority between distribution licensees and OA customers by tenure.

Regulation 8 (pp11–15) is the core procedure: applications on the SNA portal, documentary and bank-guarantee requirements, processing timelines leading to grant or deemed grant, deemed concurrence and deemed WBA approval, system studies, and commissioning deadlines. Regulation 9 covers day-ahead OA transactions. Regulations 10–13 (pp16–24) deal with non-utilisation and charges: surrender, relinquishment and compensation; heads of OA charges and their allocation between generator and consumer; computation methodologies for transmission charges including wind-solar hybrids, wheeling charges, cross-subsidy surcharge, additional surcharge, banking charges with ToD-slot banking, standby charges, losses and other fees; and treatment of residual energy.

Regulations 14–22 (pp24–27) set curtailment priority, green certificates, dispute resolution before SNA and the Commission, metering requirements, grid-code compliance, charge collection, SLDC information publication and licensee reporting. Regulations 23–27 are standard powers to issue directions, remove difficulties, amend, interpret and repeal the 2004 Regulations with savings. Forms 1–2 (pp29–30) prescribe data formats for additional-surcharge estimation, and Appendix-1 begins the standard Wheeling and Banking Agreement format.

Standard name
Open Access Regulations, Green Energy Open Access Regulations
Primary topics
Open access, Open access charges, Energy banking

Read with this

Commencement notices and reasons

One more document belongs here and is not on Voltaic: a copy in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of KERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document