KERC · Karnataka Electricity Regulatory Commission

Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2024 — First Amendment, 2024

KERC (Multi Year Transmission, Distribution and Retail Supply Tariff) (First Amendment) Regulations, 2024.

AmendmentDated 10 Dec 2024DD(Tariff)/2023-24/FTS-1345/1167 dated 10th December 2024

Amends the Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the first amendment to the KERC (Multi Year Transmission, Distribution and Retail Supply Tariff) Regulations, 2024, issued by the Karnataka Electricity Regulatory Commission on 10 December 2024 (p1). The preamble records that the principal Regulations were notified on 24 June 2024 and published in the Karnataka Gazette on 4 July 2024, and that the draft amendment was gazetted on 4 November 2024 for stakeholder comments, followed by a public hearing on 6 December 2024 at which no stakeholder participated; the Commission therefore notifies the amendment without modification (p1).

The operative change is narrow and sits entirely in the table at p2. Clause 31.6 previously required all new intra-State transmission projects of a threshold of Rupees One Hundred (100) Crores and above to be executed through Tariff-Based Competitive Bidding with prior approval of the Commission. The amended clause instead ties the threshold to a limit the Commission may prescribe through notifications from time to time, and drops the prior-approval wording (p2). Clause 31.7 is rewritten so that the earlier mechanism — threshold notified on a petition by the State Transmission Utility, with projects above it implemented through TBCB — is removed, leaving only the provision that an empowered committee constituted by the Government of Karnataka coordinates the TBCB process in line with MoP/GoI guidelines (p2). Clause 1 gives the short title and states the amendment takes effect from the date of publication in the official gazette (p2); the Gazette date is not printed.

Standard name
Multi Year Tariff Regulations
Primary topics
Competitive bidding

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document