KERC · Karnataka Electricity Regulatory Commission
Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2023 — Draft
The Karnataka Electricity Regulatory Commission (Multi Year Transmission, Distribution and Retail Supply Tariff) Regulations, 2023
Draft regulationDated 21 Sep 2023Published in the Gazette 22 Sep 2023DD(Tariff)/2023-24/FTS-1345/629 dated 21.09.2023
Draft
A proposal that has since been finalised as the Multi Year Transmission, Distribution and Retail Supply Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Karnataka Electricity Regulatory Commission has published a draft principal regulation to replace its 2000 Tariff Regulations and its 2006 transmission and distribution tariff regulations with a single multi-year tariff framework (p1-2). The draft is issued under s.181 of the Electricity Act 2003 read with ss.61, 62 and 86; comments are invited within 15 days of gazette publication (p1-2). It covers KERC tariff-setting for intra-State transmission, distribution/wheeling, retail supply, SLDC, cross-subsidy surcharge and additional surcharge (p2-3). It defines a three-financial-year Control Period from FY25 and deems the existing sixth Control Period FY23-FY25 revised to FY23-FY24 (p4).
Part I (p2-6) sets commencement, scope and definitions. Part II (p7-12) creates the MYT framework: licensees and SLDC file a Business Plan and MYT petition before the Control Period, performance trajectories are approved for losses and availability/efficiency, and gains or losses from controllable and uncontrollable factors are passed through or shared through annual performance review (p7-11). Business Plan contents for transmission and distribution licensees are listed, including load/sales forecasts, capex, power procurement, loss-reduction targets and subsidy policy (p11-12).
Part III (p12-18) lays out the petition procedure: filing, completeness checks, public notices in English and Kannada newspapers, objections, Commission orders, tariff publication and annual true-up, with specified timelines including a 120-day order timeline (p13-18). Part IV (p18-23) governs sales forecasts, treatment of distribution losses, power procurement planning including resource adequacy, RPO and storage/EV impacts, power purchase quantum and cost, and FPPCA under the 2022 FPPCA Regulations (p18-23).
Part V (p23-30) sets financial principles: prudence checks on revenue, revenue expenditure and capex; treatment of consumer contributions, grants and subsidies; debt-equity, depreciation, return on equity, interest on loans and working capital, and income tax (p23-30). Part VI (p30-41) covers transmission tariff: ARR components, capital investment plan, prudence check of capex, O&M, non-tariff and other-business income, LTOA/STOA tariff formulas, target availability, incentive, rebate and late-payment surcharge. Part VII (p42) covers SLDC charges. Part VIII (p42-53) covers distribution and retail supply: segregation of wires and retail business, an allocation matrix, wheeling charges, retail tariff categories and average cost of supply. Part IX (p53-55) deals with subsidy, cross-subsidy surcharge and additional surcharge. Part X (p55-56) has amendment/difficulty powers, repeal and savings. Annexures provide AT&C loss methodology (p57-58), prudence-check procedure and scoring formats (p58-69), and transmission availability calculation (p69-71).
Read with this
The regulation
Amendments and corrections
Earlier drafts
3 more documents belong here and are not on Voltaic: 3 copies in another language.
Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.