Skip to content

KERC · Karnataka Electricity Regulatory Commission

Multi Year Transmission, Distribution and Retail Supply Tariff (First Amendment) Regulations, 2024 — Draft

KERC (Multi Year Transmission, Distribution and Retail Supply Tariff) (First Amendment) Regulations, 2024

Draft amendmentDated 28 Oct 2024DD(Tariff)/2023-24/FTS-1345/ 849 dated 28th October 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on kerc.karnataka.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Karnataka Electricity Regulatory Commission issued this draft on 28 October 2024 (p1) proposing the first amendment to the KERC (Multi Year Transmission, Distribution and Retail Supply Tariff) Regulations, 2024 — the principal Regulations notified on 24 June 2024 and published in the Karnataka Gazette on 4 July 2024 (p1).

The stated purpose is to give the Commission flexibility in fixing the cost threshold above which new intra-state transmission projects must be executed through Tariff-Based Competitive Bidding (TBCB) (p1). The draft replaces two clauses (p2). Proposed Clause 31.6 removes the fixed monetary threshold and instead requires TBCB for all new intra-state transmission projects costing above a threshold the Commission will prescribe by notification from time to time, and drops the requirement of the Commission's prior approval. Proposed Clause 31.7 deletes the earlier mechanism under which the threshold was notified on a petition by the State Transmission Utility, together with the STU's role in formulating projects; it retains only the empowered committee constituted by the Government of Karnataka to coordinate the TBCB process in line with MoP/GoI guidelines.

The draft Regulations take effect from the date of publication in the official gazette (p2), and stakeholders have fifteen days from that publication to submit comments to the Secretary (p1).

Standard name
Multi Year Tariff Regulations
Primary topics
Competitive bidding

Read with this

3 more documents belong here and are not on Voltaic: 3 copies in another language.

Voltaic last read KERC's website for final documents on 24 Nov 2026 (3 pages) and for drafts on 23 Nov 2026. A document KERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on kerc.karnataka.gov.in ↗

Report an issue with this document