Skip to content

OERC · Odisha Electricity Regulatory Commission

Thermal Tariff Filing Forms for Determination of Tariff

TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF

OrderDate not stated

Made under the Generation Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software, from pages 1 to 57 of 79. Check the regulator's original before you rely on it.

This is a thermal tariff filing pack: a checklist and set of forms that a thermal generating company is expected to use when petitioning for tariff determination. The opening pages are navigation. Page 2 lists Forms 1–20; page 3 lists Part-I supporting forms A–T; pages 4–5 list certificates, audited accounts, loan agreements, PPA/BPSA copies, cost audit reports and other documents to be attached, with a special note that BBMB may modify the formats if they do not suit its records. The body is a series of fill-in formats. Form-1 and its sub-statements cover the summary of tariff, claimed capital cost and return on equity (p6–11). Form-2 captures plant characteristics (p12–13), while Form-3 sets out normative parameters for tariff computations and FGD/reagent consumption norms (p14–15). Forms 4 and 4A deal with foreign loans and foreign equity (p16–18). Form-5 abstracts admitted capital cost from earlier Commission orders (p19), and Form-6 captures the financial package up to COD (p20). Forms 7 and 8 cover project-specific loans and allocation of corporate loans (p21–24). Forms 9–10 cover additional capitalisation after COD and its financing (p25–26). Forms 11–12 address depreciation (p27–28), Form-13 weighted average interest on loans (p29–30), and Form-14 the drawdown schedule for IDC, financing charges, FERV, hedging and equity (p31–34). Form-15 is the source-wise, month-wise fuel data template for energy charge computation (p35–39); Form-16 covers limestone (p40); Form-17 capital spares (p41); Form-18 non-tariff income (p42); Form-19 water charges (p44); and Form-20 statutory charges (p45). Forms A–C provide new-project capital cost estimates and break-ups for coal/lignite and gas/liquid fuel projects (p46–57).

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document