OERC · Odisha Electricity Regulatory Commission
Thermal Tariff Filing Forms for Determination of Tariff
TARIFF FILING FORMS (THERMAL) FOR DETERMINATION OF TARIFF
OrderDate not stated
Made under the Generation Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 57 of 79. Check the regulator's original before you rely on it.
This is a thermal tariff filing pack: a checklist and set of forms that a thermal generating company is expected to use when petitioning for tariff determination. The opening pages are navigation. Page 2 lists Forms 1–20; page 3 lists Part-I supporting forms A–T; pages 4–5 list certificates, audited accounts, loan agreements, PPA/BPSA copies, cost audit reports and other documents to be attached, with a special note that BBMB may modify the formats if they do not suit its records. The body is a series of fill-in formats. Form-1 and its sub-statements cover the summary of tariff, claimed capital cost and return on equity (p6–11). Form-2 captures plant characteristics (p12–13), while Form-3 sets out normative parameters for tariff computations and FGD/reagent consumption norms (p14–15). Forms 4 and 4A deal with foreign loans and foreign equity (p16–18). Form-5 abstracts admitted capital cost from earlier Commission orders (p19), and Form-6 captures the financial package up to COD (p20). Forms 7 and 8 cover project-specific loans and allocation of corporate loans (p21–24). Forms 9–10 cover additional capitalisation after COD and its financing (p25–26). Forms 11–12 address depreciation (p27–28), Form-13 weighted average interest on loans (p29–30), and Form-14 the drawdown schedule for IDC, financing charges, FERV, hedging and equity (p31–34). Form-15 is the source-wise, month-wise fuel data template for energy charge computation (p35–39); Form-16 covers limestone (p40); Form-17 capital spares (p41); Form-18 non-tariff income (p42); Form-19 water charges (p44); and Form-20 statutory charges (p45). Forms A–C provide new-project capital cost estimates and break-ups for coal/lignite and gas/liquid fuel projects (p46–57).
Read with this
The regulation
- In force from 1 Apr 2024Generation Tariff Regulations, 2024
Procedures and orders made under it
- Date not statedTariff Filing Forms (Hydro) for Determination of Tariff
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.