Generation Tariff Regulations, 2024
Gazette Notification of OERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024
RegulationIn force from 1 Apr 2024
Summary
Summary written by software, from pages 1 to 32 of 76. Check the regulator's original before you rely on it.
These pages are the opening operative text of the OERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2024, Odisha's five-year generation tariff framework. It applies to existing and future generating stations, or units, whose tariff the Commission determines under the Act and its regulations/orders, but excludes stations whose tariff is set through competitive bidding or by CERC, renewable stations tariffed under OERC renewable regulations, and stations governed by an approved PPA for the agreed period (p2). Regulations 3-4 supply extensive definitions and provide that proceedings follow the OERC (Conduct of Business) Regulations, 2004 (p2-12).
Chapters 2 and 3 deal with commercial operation and tariff procedure. They determine COD and infirm-power sale under CERC DSM rules until OERC notifies its own DSM regulations, and require infirm-power revenue beyond fuel cost to reduce capital cost (p13). Tariff may be interim, provisional or supplementary; new stations file within 90 days of actual COD, existing stations by 30.12.2024 except OHPC and OPGC Units I & II, and emission-control systems get a separate supplementary-tariff application within 90 days of operation (p14-16). A special annual filing route applies to OHPC and OPGC Units I & II (p16-17). Prior-period truing up covers 2019-20 and 2020-2024 under the 2014 and 2020 regulations, while 2024-29 truing up has refund/recovery with interest (p18-19).
Chapter 4 sets the tariff structure: a two-part capacity and energy charge for thermal stations, a separate supplementary capacity/energy charge for revised emission standards, annual fixed cost components, and capacity/energy charges for hydro stations (p20-21). Chapter 5 begins the capital-cost rules: inclusions and exclusions for new, existing, hydro and NCLT-acquired projects, prudence-check principles, IDC/IEDC treatment, controllable and uncontrollable delay factors, initial-spares ceilings, additional capitalisation within and beyond original scope, R&M, and the coal-thermal Special Allowance (p22-32). Later chapters, not supplied, cover capacity/energy charge computation (Chapter 6), emission-control supplementary charges (Reg 44), hydro charges (Regs 45-46) and competitive bidding (Reg 68).
Read with this
Procedures and orders made under it
- Date not statedThermal Tariff Filing Forms for Determination of Tariff
- Date not statedTariff Filing Forms (Hydro) for Determination of Tariff
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of OERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.