OERC · Odisha Electricity Regulatory Commission
Tariff Filing Forms (Hydro) for Determination of Tariff
TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF
OrderDate not stated
Made under the Generation Tariff Regulations, 2024.
Summary
Summary written by software, from pages 1 to 59 of 69. Check the regulator's original before you rely on it.
It is not a tariff order: it is the checklist and template set a hydro generator must use when filing a tariff petition for the 2024-29 tariff period. Pages 2-4 list every form and supporting document — memorandum/articles, audited accounts, loan agreements, capital-cost approvals, foreign-equity approvals, BPSA/PPA, DPR, CPM/PERT and cost/time-overrun justification — and require an electronic copy in Word and detailed calculations in Excel plus a pen drive (p4). The same page allows BBMB to modify the formats if they do not suit its information.
The forms then collect the data the Commission needs. Form 1 and its sub-schedules summarise the tariff, claimed capital cost eligible for return on equity, and RoE at two rates (pp5-9). Form 2 captures COD, station type, NAPAF and other normative parameters (pp10-11). Form 3 records the project's physical salient features (pp12-13). Forms 4 and 4A cover foreign loans and foreign equity (pp14-16). The Form 5 series abstracts and breaks up capital cost for existing and new projects, construction/supply/service packages, and requires quantified justification for cost and time overruns (pp17-33). Forms 6-8 cover the financial package, project-specific loans and allocation of corporate loans (pp34-38). The Form 9 series handles additional capitalisation, de-capitalisation, reconciliation, exclusions, capital cost and CWIP (pp39-47), with a bar on claiming ACE for assets individually below Rs 20 lakh (p39). Form 10 finances additional capitalisation; Forms 11-12 deal with depreciation; the Form 13 series covers interest on actual/normative loans and working capital, non-tariff income and IEDC; and Form 14 gives the IDC/financing-charge drawdown schedule (pp48-59). Forms 15A-19 appear only in the checklist: design energy, liability flow, O&M, statutory charges and petition issues.
Read with this
The regulation
- In force from 1 Apr 2024Generation Tariff Regulations, 2024
Procedures and orders made under it
- Date not statedThermal Tariff Filing Forms for Determination of Tariff
Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.