Skip to content

OERC · Odisha Electricity Regulatory Commission

Tariff Filing Forms (Hydro) for Determination of Tariff

TARIFF FILING FORMS (HYDRO) FOR DETERMINATION OF TARIFF

OrderDate not stated

Made under the Generation Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software, from pages 1 to 59 of 69. Check the regulator's original before you rely on it.

It is not a tariff order: it is the checklist and template set a hydro generator must use when filing a tariff petition for the 2024-29 tariff period. Pages 2-4 list every form and supporting document — memorandum/articles, audited accounts, loan agreements, capital-cost approvals, foreign-equity approvals, BPSA/PPA, DPR, CPM/PERT and cost/time-overrun justification — and require an electronic copy in Word and detailed calculations in Excel plus a pen drive (p4). The same page allows BBMB to modify the formats if they do not suit its information.

The forms then collect the data the Commission needs. Form 1 and its sub-schedules summarise the tariff, claimed capital cost eligible for return on equity, and RoE at two rates (pp5-9). Form 2 captures COD, station type, NAPAF and other normative parameters (pp10-11). Form 3 records the project's physical salient features (pp12-13). Forms 4 and 4A cover foreign loans and foreign equity (pp14-16). The Form 5 series abstracts and breaks up capital cost for existing and new projects, construction/supply/service packages, and requires quantified justification for cost and time overruns (pp17-33). Forms 6-8 cover the financial package, project-specific loans and allocation of corporate loans (pp34-38). The Form 9 series handles additional capitalisation, de-capitalisation, reconciliation, exclusions, capital cost and CWIP (pp39-47), with a bar on claiming ACE for assets individually below Rs 20 lakh (p39). Form 10 finances additional capitalisation; Forms 11-12 deal with depreciation; the Form 13 series covers interest on actual/normative loans and working capital, non-tariff income and IEDC; and Form 14 gives the IDC/financing-charge drawdown schedule (pp48-59). Forms 15A-19 appear only in the checklist: design energy, liability flow, O&M, statutory charges and petition issues.

Standard name
Tariff Regulations
Primary topics
Tariff determination, Generation tariff, Capital cost and investment

Read with this

The regulation

Procedures and orders made under it

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document