UPERC · Uttar Pradesh Electricity Regulatory Commission
Suo Moto Order on Implementation of the 13th Amendment to the U.P. Electricity Supply Code, 2005
Suo Moto proceedings in implementation of 13th Amendment of Electricity Supply Code, 2005
CodeDate not stated
Read with a regulation not yet published on Voltaic.
Summary
Summary written by software, from pages 1 to 17 of 26. Check the regulator's original before you rely on it.
Pages 1–2 open a suo motu proceeding before the UPERC, listing the bench (Chairman Raj Pratap Singh and Members S. K. Agarwal and K. K. Sharma) and a long appearance list of managing directors, directors (commercial) and engineers from MVVNL, PVVNL, PuVVNL, DVVNL, KESCO, NPCL and Torrent Power. The order records that the Commission issued the 13th Amendment to the Electricity Supply Code, 2005 on 10.8.2018 with two directions — new connections to multi-storied buildings to be released with multi-point connection facilities, and existing single-point buildings to convert by 31.3.2019.
Because that amendment needed to be effected with minimal change to existing infrastructure, a meeting was held with RERA on 14 January 2019 under the aegis of the Chairman, RERA and the Chairman, UPERC, which set up a committee headed by MD, PVVNL with members from UPERC, NPCL, MVVNL and the Noida and Greater Noida development authorities. The Committee reported on 2.2.2019 (p2).
Pages 2–7 reproduce the Committee's 37 findings. These cover the case for dual-register (GRID/DG) prepaid metering; the requirement that DISCOMs issue binding metering guidelines; BIS/IS standards and DLMS-based communication; metering at both the single point and each consumer; computing common-area consumption as the bulk-meter reading minus the sum of individual meters; fool-proof grid/generator register logic; RF-based AMR; mandatory landing of data at the UPPCL data centre; separate grid and DG recharge coupons; DG tariff, DG revenue management and DG energy accounting to sit entirely with the RWA, outside licensee systems; licensee energy accounting for grid supply only; permitted T&D loss for energy-audit purposes; exception alerts and real-time energy audit; a mobile application; floor-wise group metering; and cost allocation between licensee, solution provider, RWA and individual consumers. Pages 5–6 set out the Committee's methodology for calculating common-area power (CAM) — the day's bulk-meter energy divided by total dwelling-unit area, allocated per square foot and debited daily to individual accounts — and note that this needs regulatory approval because no such provision exists in the Supply Code.
Pages 7–9 give the Committee's recommendations: prefer a transparent billing solution in the first instance; if that is not accepted, run one or two buildings in Noida/Greater Noida as a pilot before gradual rollout; create a separate tariff structure and tariff category for multi-storey buildings with dual metering; place the cost of common-area supply on the developer/RWA in new buildings (and where a specified share of flats is unsold), and on individual consumers for the dual-register prepaid meters; make RWA/developer responsible for internal infrastructure; and amend specific Supply Code clauses on who maintains or hands over the internal network, on transformer specifications, on the load/voltage band at which supply is sanctioned and on allowing single-point supply for multiplexes, marriage halls and centrally air-conditioned buildings.
Pages 9–17 (and beyond) reproduce a three-column table — Amendment Done / Suggestion / Required Amendment — that compares the current 13th Amendment wording, the Committee's objections and suggested alternatives, and the redrafted clause text for Part A (new connections in multi-storey buildings and colonies) and Part B (conversion of existing single-point connections).
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
- Dated 1 Mar 2005U.P. Electricity Supply Code, 2005 — Corrigendum
- Dated 25 Aug 2017U.P. Electricity Supply Code, 2005 — Ninth Amendment, 2017
- Dated 26 Sep 2017U.P. Electricity Supply Code, 2005 — Tenth Amendment, 2017
3 more documents belong here and are not on Voltaic: 2 amendments not held as English text and 1 main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.