UPERC · Uttar Pradesh Electricity Regulatory Commission

U.P. Electricity Supply Code, 2005 — Ninth Amendment, 2017

Electricity Supply Code (Ninth Amendment), 2017

AmendmentDated 25 Aug 2017UPERC/Secy./Regulations/Supply Code/2017/894 dated August 25, 2017

Amends a regulation not yet published on Voltaic.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

UPERC's Ninth Amendment to the U.P. Electricity Supply Code, 2005, issued from Lucknow on 25 August 2017 under Notification No. UPERC/Secy./Regulations/Supply Code/2017/894 (p2). The recitals set out the trigger: licensees reported difficulties with provisions of the 2005 Code and its amendments and requested changes (p2–3).

The operative text is short. Clause 1 names the instrument, provides that it comes into force on the date of publication in the Official Gazette, abolishes the provision under clause 6.8(a)(iii) inserted by the Eighth Amendment, and announces a new proviso under clause 4.9(k) (p3). Clause 2 supplies that proviso: it obliges the distribution licensee to build the distribution network needed to electrify undeveloped or un-electrified colonies within or adjoining urban areas where the developer has not developed the network, working to a scheme prepared by the licensee and recovering Rs. 35 per square feet of plot size. The scheme is triggered only where 25% of plot owners have built houses and, of those, 50% have deposited the charges in one lump sum or in instalments; owners who took connections through temporary arrangements must also pay. HT lines are to be built on STP and LT lines on PCC poles. Any cost not recovered through these charges may be claimed by the licensee as Capex in the ARR. Colonies developed by Development Authorities or Housing Boards are excluded, since their plot price already covers electrical infrastructure (p3).

Standard name
Electricity Supply Code
Primary topics
Connection and miscellaneous charges, Network planning and investment, Capital cost and investment

Read with this

The regulation itself is not yet published on Voltaic.

3 more documents belong here and are not on Voltaic: 2 amendments not held as English text and 1 main regulation not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document