UPERC · Uttar Pradesh Electricity Regulatory Commission
U.P. Electricity Supply Code, 2005 — Ninth Amendment, 2017
Electricity Supply Code (Ninth Amendment), 2017
AmendmentDated 25 Aug 2017UPERC/Secy./Regulations/Supply Code/2017/894 dated August 25, 2017
Amends a regulation not yet published on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
UPERC's Ninth Amendment to the U.P. Electricity Supply Code, 2005, issued from Lucknow on 25 August 2017 under Notification No. UPERC/Secy./Regulations/Supply Code/2017/894 (p2). The recitals set out the trigger: licensees reported difficulties with provisions of the 2005 Code and its amendments and requested changes (p2–3).
The operative text is short. Clause 1 names the instrument, provides that it comes into force on the date of publication in the Official Gazette, abolishes the provision under clause 6.8(a)(iii) inserted by the Eighth Amendment, and announces a new proviso under clause 4.9(k) (p3). Clause 2 supplies that proviso: it obliges the distribution licensee to build the distribution network needed to electrify undeveloped or un-electrified colonies within or adjoining urban areas where the developer has not developed the network, working to a scheme prepared by the licensee and recovering Rs. 35 per square feet of plot size. The scheme is triggered only where 25% of plot owners have built houses and, of those, 50% have deposited the charges in one lump sum or in instalments; owners who took connections through temporary arrangements must also pay. HT lines are to be built on STP and LT lines on PCC poles. Any cost not recovered through these charges may be claimed by the licensee as Capex in the ARR. Colonies developed by Development Authorities or Housing Boards are excluded, since their plot price already covers electrical infrastructure (p3).
Read with this
The regulation itself is not yet published on Voltaic.
Amendments and corrections
- Dated 1 Mar 2005U.P. Electricity Supply Code, 2005 — Corrigendum
- Dated 26 Sep 2017U.P. Electricity Supply Code, 2005 — Tenth Amendment, 2017
Commencement notices and reasons
3 more documents belong here and are not on Voltaic: 2 amendments not held as English text and 1 main regulation not held as English text.
Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.