Skip to content

UPERC · Uttar Pradesh Electricity Regulatory Commission

U.P. Electricity Supply Code, 2005 — Corrigendum

Amendment No. 1 to the U.P. Electricity Supply Code, 2005

CorrigendumDated 1 Mar 2005UPERC/Secretary/Regulation/05 - 4566 dated March 1, 2005

Corrects a regulation not yet published on Voltaic or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on uperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is UPERC's corrigendum to the U.P. Electricity Supply Code, 2005, issued from Lucknow on 1 March 2005 as notification No. UPERC/Secretary/Regulation/05 - 4566 (p1). It records that the Supply Code itself was notified by gazette notification No. UPERC/Secy/Regulations/2005-4528 dated 18 February 2005, made under sections 50 and 181 read with sections 43 to 48, 50 and 55–59 of the Electricity Act 2003 (p1).

The document is essentially one comparison table, headed "Instead of" and "Additions/Deletions/In case of any inconsistency", giving substitution instructions across the Code (p1–4). The corrections touch: deposits for meters and MCBs and the licensee's role in approving them (p1); a facility for remote meter reading by GSM for all 11 kV and 33 kV consumers and for distribution transformers (p1–2); the consequences when a consumer's bank guarantee is invoked — surcharge, forfeiture of rebate and withdrawal of a facility (p2); assessment provisions (p2); time limits for providing new connections, including LT connections, HT works, loads and un-electrified areas, and a disconnection period (p2–3); metering, cross-referring chapter 5 and covering replacement of defective and burnt meters (p3); billing, cross-referring chapter 6 (p3); transfer of ownership and conversion of services (p3–4); and the conditions under which the provisions on electricity dues apply (p4).

It ends "By the order of the Commission", signed by Secretary A.K. Srivastava (p4).

Standard name
Electricity Supply Code
Primary topics
Metering, New connections and load changes, Billing and payment

Read with this

The regulation itself is not yet published on Voltaic.

3 more documents belong here and are not on Voltaic: 2 amendments not held as English text and 1 main regulation not held as English text.

Voltaic last read UPERC's website for final documents on 24 Nov 2026 (2 pages). A document UPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on uperc.org ↗

Report an issue with this document