Connectivity for 'Change-over' Consumers — Practice Directions

CONNECTIVITY FOR 'CHANGE-OVER' CONSUMERS

OrderDate not stated

Replaced by Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Net Metering for Roof-top Solar Photo Voltaic Systems Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a set of Practice Directions issued by the Maharashtra Electricity Regulatory Commission to make the MERC (Net Metering for Roof-top Solar PV Systems) Regulations, 2015 work for 'change-over' consumers — consumers who have migrated from one distribution licensee to the other inside the overlapping parallel licence areas of Tata Power Co. Ltd. – Distribution and Reliance Infrastructure Ltd. – Distribution. In that situation the consumer is supplied by a 'Supply Licensee' through the network of a 'Wires Licensee', and the directions split the roles between the two (p1).

Section 2.1 sets the general rule: the Supply Licensee is the consumer's single interface and handles meter reading, energy accounting and settlement, while both licensees coordinate technical and interconnection requirements, safety, clearances, the connection agreement and disconnection. The Supply Licensee pays wheeling charges to the Wires Licensee on unadjusted net credited units, with the payment taken into account in the licensees' Aggregate Revenue Requirements (p1).

Sections 2.2–2.5 lay out a timed, sequential procedure shared between the two licensees: registration and acknowledgement of the application, its onward forwarding, the Wires Licensee's technical feasibility study report, approval or deficiency intimation to the consumer, the consumer's Work Completion Report, joint testing and commissioning, and net meter procurement, testing, installation and synchronization, ending in the Net Metering Connection Agreement (pp2–3). Queuing for applications rejected for want of distribution transformer capacity is dealt with at 2.3.4 (p2).

Sections 2.6–2.8 cover routine checks and maintenance, joint safety testing and isolation, and mutual resolution of differences (pp3–4). No date, notification number or effective date appears anywhere in the text.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, New connections and load changes

Read with this

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document