MERC · Maharashtra Electricity Regulatory Commission

Net Metering for Roof-top Solar Photo Voltaic Systems Regulations, 2015

Maharashtra Electricity Regulatory Commission (Net Metering for Roof-top Solar Photo Voltaic Systems) Regulations, 2015

RegulationDated 10 Sep 2015No. MERC / Legal /2015 / 639 dated 10th September 2015

Replaced by Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This notification makes MERC's 2015 net-metering framework for roof-top solar, issued as No. MERC/Legal/2015/639 and signed at Mumbai on 10 September 2015 (p26). It extends to the whole of Maharashtra and comes into force on publication in the Official Gazette — a date the text never prints (p14).

Regulations 1–2 fix the title, extent and commencement, and define the working vocabulary (Eligible Consumer, Net Meter, Net Metering Arrangement, Settlement Period, inter-connection point, Roof-top Solar PV System), largely by reference to the Electricity Act, the Electricity Supply Code and CEA standards (pp14–15).

Part A (Regs 3–4) requires distribution licensees to grant net metering non-discriminatorily on a first-come-first-serve basis, gives priority to systems already installed, caps the cumulative rooftop capacity on each distribution transformer at a share of its rated capacity (with a load-study route to exceed it), and requires licensees to publish and quarterly update transformer-wise headroom on their websites (pp15–16).

Part B (Regs 5–9) is the technical side: eligible-consumer system capacity is tied to contract demand or sanctioned load and to voltage-dependent limits adopted from the 2014 Standards of Performance Regulations; inter-connection must follow CEA distributed-generation and safety standards and the State Grid Code; optional battery back-up must be isolated against back-feed; metering is a licensee-installed Net Meter plus an optional Solar Generation Meter for RPO counting; a registration-fee application procedure with a technical feasibility study runs to a prescribed timeline (Annexure 1); and a 20-year Net Metering Connection Agreement is required before generation starts.

Part C (Regs 10–12) is the commercial core: per-billing-period accounting of import, export, net billed units and carried-forward credits; year-end purchase by the licensee of unadjusted credits at its approved average cost of power purchase; re-setting of carry-forward at each settlement period; time-of-day compensation; grievance recourse; allocation of Solar RPO between consumer and licensee; and exclusion of net-metered solar from the REC mechanism.

Part D (Regs 13–16) covers power to relax, orders and practice directions, amendment and removal of difficulties. Annexures 1–3 carry the application procedure, the model application form with checklist and acknowledgement, and the model connection agreement (pp21–26).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Metering, Energy accounting and settlement

Read with this

Procedures and orders made under it

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.