Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Maharashtra Electricity Regulatory Commission's principal regulation for grid-interactive rooftop renewable energy generating systems, notified on 30 December 2019 (p17) and made under sections 86(1)(e) and 181 of the Electricity Act, 2003 (p1). It replaces the 2015 rooftop solar net-metering regulations, with savings for existing systems until their agreements run out (p17). Regulation 1.3 says it comes into force from Official Gazette publication, but the Gazette date is not printed (p1).
Part A (pp5–6) sets scope and applicability. It covers net metering arrangements, net billing arrangements, and grid-connected renewable systems behind the consumer meter that opt for neither. It applies to applications received on or after notification (p5). It requires distribution licensees to approve net metering or net billing on a non-discriminatory, distribution-transformer or feeder-wise first-come-first-serve basis, caps cumulative capacity per transformer, allows a higher cap after a load study, and requires quarterly disclosure of transformer-wise capacity (pp5–6).
Part B (pp6–11) covers technical arrangements. It defines eligible consumer and individual project capacity, links project capacity to sanctioned load or contract demand, permits HT consumers to connect at LT bus bars with net metering on the HT side, and bars consumers with pending arrears (pp6–7). It specifies inter-connection standards, safety, islanding, synchronization, harmonic limits, metering infrastructure including net meters, renewable energy generation meters and check meters, the online application and registration procedure, approval validity, and the requirement for a connection agreement (pp7–11).
Part C (pp12–16) contains commercial arrangements. It provides net metering energy accounting and settlement: offsetting consumption, carrying forward excess, annual purchase of unadjusted credits at generic tariff, ToD treatment, grid support charges and an exemption category (pp12–14). It provides net billing accounting, including a power purchase agreement at APPC, a billing equation and billing credit (pp14–15). It addresses meter defects, RPO treatment, and makes these arrangements ineligible for renewable energy certificates (pp15–16).
Part D (pp16–17) contains miscellaneous powers to relax, issue orders and practice directions, amend, and remove difficulties, plus the repeal and savings clause. The annexures (pp18–32) give the application procedure, model application form and checklist, model net metering and net billing connection agreements, a prior-intimation format for behind-meter systems, and a distribution-transformer capacity reporting format.
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 30 Dec 2019Grid Interactive Rooftop RE Regulations, 2019 — Statement of Reasons
- Dated 16 Nov 2023Grid Interactive Rooftop Renewable Energy Generating Systems (First Amendment) Regulations, 2023 — Statement of Reasons
- Dated 29 Aug 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Statement of Reasons
Procedures and orders made under it
Other copies of these documents (1)
Proposed changes (drafts with no final yet)
- Released with the notice dated 5 Aug 2023Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Draft
- Dated 5 Aug 2023Public notice: Public Notice — Comments on Draft Open Access, Rooftop Renewable and RPO/REC Amendment Regulations, 2023
- Released with the notice dated 5 Aug 2023Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — First Amendment, 2023 — Explanatory Memorandum — Draft
- Dated 24 Aug 2023Notice extending the date for comments: Public Notice — Extension of time for comments on Draft Regulations, August 2023
Earlier drafts
- Released with the notice dated 23 May 2024Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019 — Second Amendment, 2024 — Draft
- Released with the notice dated 23 May 2024Explanatory memorandum: Grid Interactive Rooftop Renewable Energy Generating Systems, 2019 — Second Amendment, 2024 — Explanatory Memorandum
- Dated 23 May 2024Public notice: Public Notice Inviting Comments on Draft Supply Code and Rooftop Renewable Energy Amendment Regulations, 2024
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.