Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Grid Interactive Rooftop Renewable Energy Generating Systems Regulations, 2019

Maharashtra Electricity Regulatory Commission (Grid Interactive Rooftop Renewable Energy Generating Systems) Regulations, 2019

RegulationDated 30 Dec 2019No. MERC / Tech /Regulation/2019 /1234 dated 30 December, 2019

2 amendments to it are on Voltaic, the latest dated 29 Aug 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Maharashtra Electricity Regulatory Commission's principal regulation for grid-interactive rooftop renewable energy generating systems, notified on 30 December 2019 (p17) and made under sections 86(1)(e) and 181 of the Electricity Act, 2003 (p1). It replaces the 2015 rooftop solar net-metering regulations, with savings for existing systems until their agreements run out (p17). Regulation 1.3 says it comes into force from Official Gazette publication, but the Gazette date is not printed (p1).

Part A (pp5–6) sets scope and applicability. It covers net metering arrangements, net billing arrangements, and grid-connected renewable systems behind the consumer meter that opt for neither. It applies to applications received on or after notification (p5). It requires distribution licensees to approve net metering or net billing on a non-discriminatory, distribution-transformer or feeder-wise first-come-first-serve basis, caps cumulative capacity per transformer, allows a higher cap after a load study, and requires quarterly disclosure of transformer-wise capacity (pp5–6).

Part B (pp6–11) covers technical arrangements. It defines eligible consumer and individual project capacity, links project capacity to sanctioned load or contract demand, permits HT consumers to connect at LT bus bars with net metering on the HT side, and bars consumers with pending arrears (pp6–7). It specifies inter-connection standards, safety, islanding, synchronization, harmonic limits, metering infrastructure including net meters, renewable energy generation meters and check meters, the online application and registration procedure, approval validity, and the requirement for a connection agreement (pp7–11).

Part C (pp12–16) contains commercial arrangements. It provides net metering energy accounting and settlement: offsetting consumption, carrying forward excess, annual purchase of unadjusted credits at generic tariff, ToD treatment, grid support charges and an exemption category (pp12–14). It provides net billing accounting, including a power purchase agreement at APPC, a billing equation and billing credit (pp14–15). It addresses meter defects, RPO treatment, and makes these arrangements ineligible for renewable energy certificates (pp15–16).

Part D (pp16–17) contains miscellaneous powers to relax, issue orders and practice directions, amend, and remove difficulties, plus the repeal and savings clause. The annexures (pp18–32) give the application procedure, model application form and checklist, model net metering and net billing connection agreements, a prior-intimation format for behind-meter systems, and a distribution-transformer capacity reporting format.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Metering

Read with this

Other copies of these documents (1)

10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft not held as English text, 4 drafts or notices on a draft and 1 copy in another language.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document