HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff Regulations, 2024 — Finalisation Order
In the matter of the Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024.
OrderDated 5 Jun 2024Published in the Gazette 23 Feb 2024
Read with the Hydro Generation Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Himachal Pradesh Electricity Regulatory Commission's order of 5 June 2024 closing the public consultation on the HPERC (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024. It is the statement of reasons behind the final regulation rather than the regulation itself — the regulation text is not reproduced here — so it is useful for understanding why each provision looks the way it does (p10).
Pages 1–2 record the process: the draft was notified on 17 February 2024 and published in the Rajpatra on 23 February 2024; objections were invited through newspaper notices with 26 March 2024 as the last date; major stakeholders (Government of Himachal Pradesh, HPSEBL, HPPTCL, HPPCL, small hydro project developers' associations, Directorate of Energy, HIMURJA, Jal Shakti Vibhag, industry and hotelier associations) were written to; written comments came from HPSEBL and HPPTCL; and a public hearing was held at Shimla on 28 March 2024, whose participants are listed in Annexure-A (p11).
Pages 2–10 consider the objections item by item under letters (a)–(v), each with the Commission's view. Most objections were rejected. The Commission repeatedly anchors its choices to its own 2023 MYT Distribution Regulations and Transmission Tariff Regulations and, selectively, to the CERC Tariff Regulations, 2024 — accepting CERC alignment on capital spares and on condonation of delay but refusing it on return on equity, carrying cost and interim tariff. A handful of changes were accepted: the capital-spares definition, useful life measured from the date of commercial operation (Reg 3.1.94), a higher ceiling for condoning delayed commissioning (Reg 24.6), and a wholly new sub-regulation 42.7(c) allowing design energy to be revised where actual generation has exceeded design energy for at least ten years under a long-term PPA (p10). The order also states that 'certain other need based changes' were made, which it does not enumerate (p10).
Read with this
The regulation
- Dated 5 Jun 2024Hydro Generation Tariff Regulations, 2024
Earlier drafts
- Dated 17 Feb 2024Hydro Generation Tariff Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.