HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff Regulations, 2024
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024
RegulationDated 5 Jun 2024No. HPERC-F(1)-74/2024.- dated the 5 th June, 2024
Summary
Summary written by software, from pages 1 to 28 of 64. Check the regulator's original before you rely on it.
The Himachal Pradesh Electricity Regulatory Commission notified these regulations at Shimla on 5 June 2024 (p1). They govern how the Commission determines the aggregate revenue requirement (ARR) and generation tariff for hydro power supplied to distribution licensees in the State under Section 62 of the Electricity Act, 2003, over a control period running from 1 April 2024 to 31 March 2029 (p1). They apply to all existing and future hydro generating companies, including stations of more than 25 MW, but exclude captive generating plants and renewable energy sources (p2). They supersede the Commission's 2011 hydro generation tariff regulations, while a proviso keeps the 2011 regime alive for all matters up to 31 March 2024, including review matters (p1).
Part I (p1–12) covers commencement, extent, scope and the three routes to tariff — adoption of competitively bid tariffs, determination according to an existing or Commission-approved PPA, and the MYT route for the rest — followed by 81 definitions running from accounting statements and admitted capital cost to useful life, force majeure, NAPAF and pumped storage.
Part II (p12–24) is the operative framework. It requires a business plan and capital investment plan with detailed project reports filed before the control period (p14–15), a Commission-determined baseline (p13), segregated plant-wise accounts (p13), trajectories for controllable parameters such as plant availability, auxiliary consumption, O&M and financing cost (p16), and an MYT petition supported by mathematical models in Commission formats (p16–17). It then deals with tariff determination stage-wise, unit-wise or for the whole station (p17–18); the petition process and interim tariff for new and existing stations (p18–20); the mid-term performance review petition due 30 November 2026 (p20); true-up principles (p21); carrying cost (p22); operational norms, including NAPAF criteria and ceiling auxiliary consumption (p22–23); and the mechanisms for passing through uncontrollable costs and sharing controllable gains and losses with beneficiaries (p23–24). The Commission retains a suo motu power to determine tariff or fees at any time (p24).
Part III addresses capital cost: what it comprises for new and existing projects, what is excluded, the treatment of projects acquired through NCLT/IBC proceedings, prudence check, and interest and incidental expenditure during construction.
Read with this
Commencement notices and reasons
- Dated 5 Jun 2024Hydro Generation Tariff Regulations, 2024 — Finalisation Order
Earlier drafts
- Dated 17 Feb 2024Hydro Generation Tariff Regulations, 2024 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.