Hydro Generation Tariff Regulations, 2024 — Draft

Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024

Draft regulationDated 17 Feb 2024No. HPERC-F(1)-74/2024 dated 17th February, 2024

Draft

A proposal that has since been finalised as the Hydro Generation Tariff Regulations, 2024.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024, issued with notification No. HPERC-F(1)-74/2024 dated 17 February 2024. It is a consultation draft: the Commission proposes to replace the 2011 hydro generation tariff framework and invites objections or suggestions within thirty days of publication in the Rajpatra, after which the draft will be taken up (p1-2). The regulations are to extend to Himachal Pradesh and apply to existing and future hydro generating companies supplying hydro power under Section 62 of the Electricity Act 2003, including hydro generating stations above 25 MW, excluding captive generating plants and renewable energy sources, for ARR and tariff determination from 1 April 2024 to 31 March 2029 (p2-3). They are to come into force on Gazette notification, and pre-1 April 2024 review matters remain under the 2011 regulations (p2).

Part I (pp2-14) covers commencement, scope, control period, supersession of the 2011 regulations, and definitions. Part II (pp14-26) sets guiding principles: MYT framework, business plan, baseline values, segregated accounts, performance trajectories, tariff determination, applications, mid-term review, true-up, carrying cost, operational norms, and sharing of gains and losses on controllable and uncontrollable factors. Part III (pp26-44) specifies ARR principles: capital cost, prudence check, IDC/IEDC, initial spares, additional capitalisation within and after the cut-off date and beyond original scope, R&M, capital cost approval, treatment of grants and consumer contributions, debt-equity, infirm power, and ARR components including O&M, return on equity, tax on return on equity, interest on loan and working capital, and depreciation.

Part IV (pp44-52) deals with tariff and charges: two-part capacity and energy charges for hydro stations, formula-based capacity charge, energy charge rate and incentives, a separate monthly capacity-charge and energy-charge mechanism for pumped storage hydro, deviation charges, billing and payment, statutory charges, rebates, late payment surcharge, payment security, safety, metering, scheduling, and declared-capacity demonstration with penalties. Part V (pp52-55) is the tariff filing procedure: business plan filings, tariff filing, mid-term performance review, end-of-control-period review, disposal of applications, periodic reviews and publication. Part VI (pp55-58) covers miscellaneous matters: CDM benefit sharing, ceiling norms and ceiling tariff, foreign exchange hedging and recovery, transitory provisions, fees, orders and practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiries, and repeal and savings. Appendices I and II (pp59-64) prescribe depreciation schedules for existing and new projects respectively. A notable internal inconsistency is that clause 2.3 supersedes the 2011 Hydro Generation Tariff Regulations, while clause 74.1 repeals the 2011 Transmission Tariff Regulations (p2, p58).

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.