HPERC · Himachal Pradesh Electricity Regulatory Commission
Hydro Generation Tariff Regulations, 2024 — Draft
Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024
Draft regulationDated 17 Feb 2024No. HPERC-F(1)-74/2024 dated 17th February, 2024
Draft
A proposal that has since been finalised as the Hydro Generation Tariff Regulations, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft Himachal Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Hydro Generation Tariff) Regulations, 2024, issued with notification No. HPERC-F(1)-74/2024 dated 17 February 2024. It is a consultation draft: the Commission proposes to replace the 2011 hydro generation tariff framework and invites objections or suggestions within thirty days of publication in the Rajpatra, after which the draft will be taken up (p1-2). The regulations are to extend to Himachal Pradesh and apply to existing and future hydro generating companies supplying hydro power under Section 62 of the Electricity Act 2003, including hydro generating stations above 25 MW, excluding captive generating plants and renewable energy sources, for ARR and tariff determination from 1 April 2024 to 31 March 2029 (p2-3). They are to come into force on Gazette notification, and pre-1 April 2024 review matters remain under the 2011 regulations (p2).
Part I (pp2-14) covers commencement, scope, control period, supersession of the 2011 regulations, and definitions. Part II (pp14-26) sets guiding principles: MYT framework, business plan, baseline values, segregated accounts, performance trajectories, tariff determination, applications, mid-term review, true-up, carrying cost, operational norms, and sharing of gains and losses on controllable and uncontrollable factors. Part III (pp26-44) specifies ARR principles: capital cost, prudence check, IDC/IEDC, initial spares, additional capitalisation within and after the cut-off date and beyond original scope, R&M, capital cost approval, treatment of grants and consumer contributions, debt-equity, infirm power, and ARR components including O&M, return on equity, tax on return on equity, interest on loan and working capital, and depreciation.
Part IV (pp44-52) deals with tariff and charges: two-part capacity and energy charges for hydro stations, formula-based capacity charge, energy charge rate and incentives, a separate monthly capacity-charge and energy-charge mechanism for pumped storage hydro, deviation charges, billing and payment, statutory charges, rebates, late payment surcharge, payment security, safety, metering, scheduling, and declared-capacity demonstration with penalties. Part V (pp52-55) is the tariff filing procedure: business plan filings, tariff filing, mid-term performance review, end-of-control-period review, disposal of applications, periodic reviews and publication. Part VI (pp55-58) covers miscellaneous matters: CDM benefit sharing, ceiling norms and ceiling tariff, foreign exchange hedging and recovery, transitory provisions, fees, orders and practice directions, removal of difficulties, relaxation, interpretation, inherent powers, enquiries, and repeal and savings. Appendices I and II (pp59-64) prescribe depreciation schedules for existing and new projects respectively. A notable internal inconsistency is that clause 2.3 supersedes the 2011 Hydro Generation Tariff Regulations, while clause 74.1 repeals the 2011 Transmission Tariff Regulations (p2, p58).
Read with this
The regulation
- Dated 5 Jun 2024Hydro Generation Tariff Regulations, 2024
Commencement notices and reasons
- Dated 5 Jun 2024Hydro Generation Tariff Regulations, 2024 — Finalisation Order
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.