Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020

Rajasthan Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020

RegulationDated 2 Nov 2020In force from 1 Apr 2020No. RERC/Secy/Regulation 138 dated November 02, 2020

3 amendments to it are on Voltaic, the latest dated 30 Jun 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software, from pages 1 to 77 of 93. Check the regulator's original before you rely on it.

This is the Rajasthan Electricity Regulatory Commission's principal renewable-energy tariff regulation for the 2020-24 control period. Part I (pp52-57) gives the short title, extends the regulations to Rajasthan, makes them applicable to tariff determination from 1 April 2020 to 31 March 2024, and brings them into force from 1 April 2020. It defines renewable-energy technologies, project types and commercial terms, sets scope and eligibility for new RE stations selling to distribution licensees, extends certain non-tariff conditions to captive, open-access and behind-the-meter RE plants, and requires the Commission to adopt tariffs determined through transparent competitive bidding under s.63.

Parts II and III (pp57-65) provide general principles and financial principles. They establish control period and tariff period, the routes for competitive bidding, generic tariff and project-specific tariff, the procedure and documents for tariff petitions, tariff structure and levellised tariff design, must-run and merit-order despatch treatment, and cost/return norms covering capital cost, debt-equity, loan interest, depreciation, return on equity, working capital, O&M escalation, rebate, late-payment surcharge, and treatment of subsidies, incentives and accelerated depreciation.

Parts IV-XIV (pp65-74) set technology-specific parameters for wind, solar PV, solar thermal, biomass Rankine, biogas, biomass gasifier, small hydro, non-fossil cogeneration, municipal solid waste and refuse-derived fuel, renewable hybrid, and renewable energy with storage projects. They specify which parameters are normative or project-specific, how capital cost and O&M are treated, CUF/PLF, auxiliary consumption, station heat rate, calorific value, fuel price and escalation, variable-charge formulas, re-powering conditions, and storage capacity/efficiency requirements.

Part XV (pp74-77) covers other matters: continuation tariffs for existing wind, biomass and other RE plants commissioned under Government of Rajasthan policies; generation-based-incentive solar tariff treatment; grid connectivity charges and injection limits; metering and loss norms; and the start of other charges including kVArh charges. The text refers to Annexure-I and to forms for tariff petitions.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Competitive bidding

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document