RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020
Rajasthan Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2020
RegulationDated 2 Nov 2020In force from 1 Apr 2020No. RERC/Secy/Regulation 138 dated November 02, 2020
3 amendments to it are on Voltaic, the latest dated 30 Jun 2026.
Summary
Summary written by software, from pages 1 to 77 of 93. Check the regulator's original before you rely on it.
This is the Rajasthan Electricity Regulatory Commission's principal renewable-energy tariff regulation for the 2020-24 control period. Part I (pp52-57) gives the short title, extends the regulations to Rajasthan, makes them applicable to tariff determination from 1 April 2020 to 31 March 2024, and brings them into force from 1 April 2020. It defines renewable-energy technologies, project types and commercial terms, sets scope and eligibility for new RE stations selling to distribution licensees, extends certain non-tariff conditions to captive, open-access and behind-the-meter RE plants, and requires the Commission to adopt tariffs determined through transparent competitive bidding under s.63.
Parts II and III (pp57-65) provide general principles and financial principles. They establish control period and tariff period, the routes for competitive bidding, generic tariff and project-specific tariff, the procedure and documents for tariff petitions, tariff structure and levellised tariff design, must-run and merit-order despatch treatment, and cost/return norms covering capital cost, debt-equity, loan interest, depreciation, return on equity, working capital, O&M escalation, rebate, late-payment surcharge, and treatment of subsidies, incentives and accelerated depreciation.
Parts IV-XIV (pp65-74) set technology-specific parameters for wind, solar PV, solar thermal, biomass Rankine, biogas, biomass gasifier, small hydro, non-fossil cogeneration, municipal solid waste and refuse-derived fuel, renewable hybrid, and renewable energy with storage projects. They specify which parameters are normative or project-specific, how capital cost and O&M are treated, CUF/PLF, auxiliary consumption, station heat rate, calorific value, fuel price and escalation, variable-charge formulas, re-powering conditions, and storage capacity/efficiency requirements.
Part XV (pp74-77) covers other matters: continuation tariffs for existing wind, biomass and other RE plants commissioned under Government of Rajasthan policies; generation-based-incentive solar tariff treatment; grid connectivity charges and injection limits; metering and loss norms; and the start of other charges including kVArh charges. The text refers to Annexure-I and to forms for tariff petitions.
Read with this
Amendments and corrections
- Dated 4 Sep 2023RE Tariff Determination (First Amendment) Regulations, 2023
- Dated 8 Dec 2023Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2023
- Dated 30 Jun 2026Terms and Conditions for Tariff determination from Renewable Energy Sources, 2020 — Third Amendment, 2026
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.