RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for Tariff determination from Renewable Energy Sources, 2020 — Third Amendment, 2026
Rajasthan Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Third Amendment) Regulations, 2026
AmendmentDated 30 Jun 2026Published in the Gazette 8 Sep 2026In force from 1 Apr 2026No. RERC/Secy./Reg./166 dated June 30, 2026
Amends the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Third Amendment to RERC's renewable energy tariff regulations, issued at Jaipur on 30 June 2026 (p3) and carried in the Rajasthan Gazette Extraordinary of 8 September 2026 (p1). It changes eight provisions of the RERC (Terms and Conditions for Determination of Tariff from Renewable Energy Sources) Regulations, 2020, and states that it comes into force from 1 April 2026 — earlier than its own notification date (p3).
The first two clauses reset the principal regulations' temporal frame. Regulation 1.2 is replaced so that the regulations extend to the whole State of Rajasthan and apply to tariff determination from 1 April 2020 up to 31 March 2028 (p3). Regulation 5.1 is replaced with a control period of eight financial years running from 1 April 2020 to 31 March 2028 (p3–4).
A new regulation 21A is inserted, fixing the basis on which capacity utilisation factor and plant load factor are reckoned — annually, with the number of hours in a year taken as 24 multiplied by the days in the financial year under consideration (p4). Regulation 23.1 is replaced so that a late payment surcharge applies where payment is delayed beyond 45 days from presentation of bills, at the rate specified in the Ministry of Power's Electricity (Late Payment Surcharge and Related Matters) Rules, 2022 as amended from time to time (p4).
On storage, regulation 84.1 is replaced so that the minimum rated energy capacity of an Energy Storage System is that proposed in the project and agreed by the procuring entity (p4), and the proviso to regulation 85.1 is substituted with a minimum efficiency figure for solid-state battery storage (p4).
Finally, the amendment routes three matters to the RERC Green Energy Open Access Regulations, 2025: new fourth provisos to regulations 91.4.1(c) and 91.6 place transmission and wheeling charge relaxations, and cross-subsidy and additional surcharge relaxations, under those regulations (p4–5), and regulation 93.1–93.7 is replaced so that banking is likewise governed by them (p5).
Read with this
The regulation
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.