Skip to content

TSERC · Telangana State Electricity Regulatory Commission

MYT Regulation 2023 — Tariff Filing Forms Appendices

Appendix to MYT Regulation 2023

OrderDated 30 Dec 2023

Made under the Multi Year Tariff Regulation, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software, from pages 1 to 68 of 236. Check the regulator's original before you rely on it.

The pages are the forms appendices to the TSERC MYT Regulation, 2023, not the regulation's operative text. Page 1 opens Appendix 1: Tariff Filing Forms (Generation), and page 36 opens Appendix 2: Tariff Filing Forms (Input Price). They prescribe the templates, checklists and supporting statements a generating entity must file with the Commission for tariff determination, true-up and capital cost approval, and for an integrated mine's input price.

Appendix 1 (pp1–35) starts with a checklist (p2) listing Forms 1–19.8. Form 1 is the summary sheet tying annual fixed charges, energy charges and financial heads to supporting forms (p3). Form 2 and sub-forms 2.1–2.3 break O&M into employee, A&G and R&M expense statements, with separate treatment for existing stations and new stations achieving COD in the control period (pp4–7). Forms 3, 3.1 and 3.2 cover capital expenditure, additional capitalisation after COD and its financing (pp8–10); Form 4 requires fixed asset and depreciation statements (p11); Forms 5 and 6 cover interest and finance charges on normative/actual loans and working capital interest (pp12–13); Form 7 sets out return on equity computation (p14); Form 8 lists non-tariff income (p15); Form 9 captures planned and forced outages (p16); Form 10 captures operational parameters such as availability, PLF, auxiliary consumption, heat rate and transit loss (p17); Form 11 collects fuel procurement, price, transportation and quality details for the energy charge rate (p18); Form 12 computes ECR from those inputs (p19); Forms 13–15 reconcile sales, revenue and revenue against approved figures (pp20–22); Form 16 summarises true-up, separating controllable and uncontrollable deviations (p23). Forms 17–18 describe thermal and hydel plant characteristics (pp24–25). Forms 19.1–19.8 support capital cost approval: project schedule, abstract and break-up of capital cost, package-wise construction details, financial package, loan details, phasing of expenditure/debt/equity and IDC/finance charges (pp26–35).

Appendix 2 (pp36–68) mirrors this for an integrated mine's input price. Its checklist (p37) lists Forms 1–14. Form 1 summarises input price, Form 1A summarises ROM cost and Form 1B captures additional charges for crushing, transportation, handling or washing (pp39–43). Forms 2–2.2 cover capital expenditure, additional capitalisation and financing (pp44–48); Form 3 fixed assets and depreciation (pp49–53); Form 4 interest on loan (pp54–56); Form 5 return on equity (p57); Form 6 working capital interest (p58); Form 7 O&M expenses, including agency charges other than MDO (p59); Form 8 mine closure expenses (pp60–61); Form 9 statutory charges such as royalty and GST (p62); Form 10 mine characteristics from the approved mine plan (p63); and Form 11 break-up of capital cost for a new integrated mine, with notes on cost/time overrun justification (pp65–68). No issuing clause, notification number, gazette or effective date is printed in pages 1–68; Form 3.1 only cross-refers to the relevant clause of the TSERC MYT Regulation, 2023 (p8).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Generation tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document