Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Draft Multi Year Tariff Regulation, 2023 — Explanatory Note

EXPLANATORY NOTE ON DRAFT TELANGANA STATE ELECTRICITY REGULATORY COMMISSION (MULTI YEAR TARIFF) REGULATION, 2023

Explanatory memorandum to a draftReleased with the notice dated 16 Nov 2023

Draft

The draft has since been finalised as the Multi Year Tariff Regulation, 2023.

Explanatory memorandum to the Multi Year Tariff Regulation, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is Telangana State Electricity Regulatory Commission's explanatory memorandum for the draft TSERC (Multi Year Tariff) Regulation, 2023 — the reasoned account, part by part, of what the Commission proposes to change before it finalises the regulation that will govern tariffs for the control period beginning 01.04.2024 (p1, p7).

Chapter 1 sets the legal and policy backdrop: the Commission's tariff functions under s.86(1)(a), the MYT and CERC-guided principles in s.61, the heads of tariff in s.62, and a list of the regulations currently governing the period up to 31.03.2024 that the draft is meant to consolidate (p4–7).

Chapter 2 describes the proposed MYT framework — objectives, commencement, a five-year control period from 01.04.2024, the scope of Multi Year Tariff and Annual Tariff petitions for each business, and the split between controllable and uncontrollable factors with the existing gain- and loss-sharing mechanisms retained (p8–13).

Chapter 3 sets out financial principles: prudence and cost audit, capital cost and interest during construction, additional capitalisation, debt-equity, depreciation and useful life, return on equity (replacing return on capital employed), interest on loan and working capital, carrying cost, rebate, penalties and delayed payment charges and surcharge (p14–20).

Chapters 4 to 9 apply them business by business: generation tariff, operating norms and O&M for thermal and hydro stations (p21–24); input price of coal from integrated mines, following CERC with modifications (p25); transmission — applicability, tariff-based competitive bidding for new intra-State schemes with a proposed threshold limit of Rs. 300 Crore, tariff components and short-term tariff basis (p26–30); distribution wheeling ARR, separation of wheeling and retail supply accounts, and O&M (p31–32); retail supply ARR, power procurement through competitive bidding, PPA approval and O&M (p33–34); and SLDC, replacing the annual fee and operating charges approach with ARR-based charges (p35–36).

Everything is stated as proposed: no notification, no independent effective date and no express repeal clause appear in the text.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Wheeling and retail supply tariff

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document