Skip to content

TSERC · Telangana State Electricity Regulatory Commission

Multi Year Tariff Regulation, 2023 — First Amendment, 2026

Telangana Electricity Regulatory Commission (Multi Year Tariff) First Amendment Regulation, 2026

AmendmentDated 3 Jun 2026No. TGERC/Secy/D.No.405/2026 dated 03.06.2026

Amends the Multi Year Tariff Regulation, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tgerc.telangana.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Telangana Electricity Regulatory Commission (TGERC) issued its first amendment to the Multi Year Tariff Regulation, 2023 (Regulation No. 2 of 2023), which had been notified on 30.12.2023 and applied from 01.04.2024. Issued as Regulation No. 05 of 2026 on 03.06.2026, the amendment extends to the whole of Telangana and comes into force on publication in the Telangana Gazette — the Gazette date is not printed in the text (p1).

The Commission explains the need: DISCOMs and stakeholders told it during ARR hearings that the Principal Regulation's fuel cost adjustment (FCA) provisions, particularly the restriction on claiming FCA beyond prescribed timelines, caused unrecovered fuel cost variation and financial stress, and obstructed consideration of actual fuel cost variation at true-up (p1–2). TGTRANSCO separately asked for an enhanced threshold for works executed through tariff-based competitive bidding (TBCB) (p2).

Most of the amendment rewrites Chapter 13's FCA machinery. It substitutes the clause on the maximum FCA levyable without prior Commission approval — Rs.0.30 per unit (in kWh), positive or negative — and the treatment of amounts above it, which go to true-up (13.3(b), p2); the consumer categories from which FCA is recoverable and the exclusion of LT-V agricultural consumers (13.3(c), p3); the consequence of failing to pass through FCA in time (13.3(d), p3); the voltage-wise FCA formula and loss factors (13.4, p3–4); the basis for actual power purchase cost (13.7, p4); and the procedure for monthly computation, website publication and intimation to the Commission (13.8, p4). Clause 13.9(c) and clause 13.10 are deleted. Clause 13.11 is replaced with what the true-up petition must contain, and 13.12 fixes the month-by-month FCA computation, display and billing timeline (pp4–5).

Two clauses outside Chapter 13 are also touched: clause 9.5's first paragraph, on the languages and manner of the public notice for tariff petitions, and clause 10.2, on publication of the Commission-approved retail supply tariff (pp1–2). Finally, a proviso is added to clause 68.3 letting the State Government exempt specific important or urgent projects from TBCB on a case-to-case basis, with the transmission licensee enclosing the exemption with its investment proposal (p5).

Standard name
Multi Year Tariff Regulations
Primary topics
Fuel and power purchase cost adjustment, ARR and true-up, Competitive bidding

Read with this

The regulation

Commencement notices and reasons

Procedures and orders made under it

Other copies of these documents (1)

Earlier drafts

Voltaic last read TSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document TSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tgerc.telangana.gov.in ↗

Report an issue with this document