RERC · Rajasthan Electricity Regulatory Commission
Grid Interactive Distributed Renewable Energy Generating Systems Regulations, 2021
Rajasthan Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021
RegulationDated 8 Apr 2021Published in the Gazette 15 Jun 2021RERC/Secy/Reg – 144 dated April 08, 2021
3 amendments to it are on Voltaic, the latest dated 13 Oct 2025.
Summary
Summary written by software, from pages 1 to 73 of 78. Check the regulator's original before you rely on it.
The document is the Rajasthan Electricity Regulatory Commission's Notification No. RERC/Secy/Reg–144 dated Jaipur, 8 April 2021, which makes the RERC (Grid Interactive Distributed Renewable Energy Generating Systems) Regulations, 2021 under s.181 read with ss.61, 66 and 86(1)(e) of the Electricity Act, 2003 (p46). It extends to all of Rajasthan and comes into force on gazette publication; the gazette masthead on p1 carries 15 June 2021. Systems commissioned on or after 1 July 2021 fall under it, while rooftop and small solar systems net-metered up to 30 June 2021 remain under the RERC 2015 net-metering regulations, which these regulations expressly keep in force (p46, p49–50).
Regulations 1–3 (pp46–50) set commencement, define the working vocabulary — net billing, net metering, RESCO, RE generation meter, settlement period, storage and so on — and fix scope: net metering, net billing, and grid-parallel distributed RE systems installed behind the consumer's meter that opt for neither. Net metering eligibility is tied to the Electricity (Rights of Consumers) Rules, 2020 and is subject to technical feasibility (p49).
Regulations 4–7 (pp50–52) carry the general principles — non-discriminatory, first-come-first-served offering, no arrears, RESCO-owned systems allowed with a direct consumer–RESCO contract and no tripartite agreement — and the capacity architecture: a distribution-transformer ceiling, a per-consumer cap tied to sanctioned load/contract demand, and a band within which net metering/net billing is available, with larger projects pushed to the RE tariff regulations.
Regulation 8 (pp52–54) is the procedural spine: publicity and web-portal duties, application and acknowledgement, technical-feasibility and approval timelines, cure of deficiencies, and the commissioning period after the Letter of Approval. Regulation 9 (p54) covers the connection agreement, model forms and its duration.
Regulation 10 (pp55–58) is the technical chapter: conformity with CEA codes and the supply code, responsibility up to the interconnection point, disconnection rights, anti-islanding and synchronisation duties, the isolating switch, and Reg 10.14, which creates a separate regime for systems behind the consumer's meter that export nothing, with penalties for inadvertent injection and for failure to intimate. Regulation 11 (pp58–59) handles metering. Regulation 12 (pp59–63) is the commercial heart — bill contents, the net billing price basis and billing-credit mechanics, and net metering settlement that differs between domestic and other consumers. Regulations 13–18 (pp63–65) cover reporting, RPO treatment of self-generated units, exemptions from banking/wheeling/cross-subsidy/additional surcharge, CDM benefit sharing, parallel operation charges and penalties. Regulations 19–22 (p65) are residual powers.
Annexures I–IV-B (pp66–73) give abbreviations, the model application form, the fee and security-deposit schedule and the two model connection agreements.
Read with this
Amendments and corrections
- Dated 28 Aug 2023Grid Interactive Distributed Renewable Energy Generating Systems Regulations — First Amendment, 2023
- Dated 25 Jul 2024Grid Interactive Distributed Renewable Energy Generating Systems (Second Amendment) Regulations, 2024
- Dated 13 Oct 2025Grid Interactive Distributed Renewable Energy Generating Systems, 2021 — Third Amendment, 2025
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of RERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.