Grid Interactive Distributed Renewable Energy Generating Systems Regulations — First Amendment, 2023
Rajasthan Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Generating Systems) (First Amendment) Regulations, 2023
AmendmentDated 28 Aug 2023No. RERC/Secy./Reg./149 dated August 28, 2023
Amends the Grid Interactive Distributed Renewable Energy Generating Systems Regulations, 2021.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A short amending instrument by the Rajasthan Electricity Regulatory Commission that rewrites a handful of provisions of its Grid Interactive Distributed Renewable Energy Generating Systems Regulations. It was issued at Jaipur on 28 August 2023 as Notification No. RERC/Secy./Reg./149 and takes effect from publication in the Official Gazette, which is not dated in the text (p4).
The substantive changes are substitutions in four regulations of the parent instrument. In Regulation 6, the distribution-transformer-level cap on cumulative renewable capacity is restated, with the licensee bearing augmentation cost and an exemption for HT consumers who own the transformer (p5). Regulation 10 fixes the permissible inverter AC capacity behind a consumer's meter and treats excess generation in a time block as deemed drawl (p5). Regulation 12 is the largest block: it re-casts the tariff basis for connection agreements, sets the AC-capacity ceiling and treatment of excess energy under Net Billing and Net Metering, restates the purchase rate and credit mechanism for excess energy exported by domestic consumers, and revises slab billing of net imported energy (p5–7). Regulation 15 gains a new proviso exempting RESCO-owned renewable systems under Net Metering for domestic, State Government, local body and State public undertaking consumers from cross-subsidy and additional surcharge (p7).
They appear to be a contents listing of the amendment clauses against the page numbers of the parent regulations.
Read with this
The regulation
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.