RERC · Rajasthan Electricity Regulatory Commission

Grid Interactive Distributed Renewable Energy Generating Systems (Second Amendment) Regulations, 2024

Rajasthan Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Generating Systems) (Second Amendment) Regulations, 2024

AmendmentDated 25 Jul 2024Published in the Gazette 30 Aug 2024No. RERC/Secy./Reg./154 dated July 25 2024

Amends the Grid Interactive Distributed Renewable Energy Generating Systems Regulations, 2021.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short amending notification of the Rajasthan State Electricity Regulatory Commission, issued at Jaipur on 25 July 2024 as No. RERC/Secy./Reg./154 (p2) and carried in the Rajasthan Gazette (p1). It changes two regulations in the Commission's framework for grid-interactive distributed renewable energy generating systems. It takes effect from the date of publication in the Official Gazette (p2).

The first change (p2–3) adds a third proviso under sub-regulation 12.6.1(a). Educational institutions recognised by the Government of India or the Government of Rajasthan that have opted for net metering may instead opt for net billing for any two months within a financial year, provided they intimate the distribution licensee before that period begins.

The second change (p3) rewrites two sub-regulations on the connection process. Sub-regulation 8.8 becomes a deadline rule: the technical feasibility study must be completed and its outcome intimated within fifteen days, and failure to intimate is treated as a finding of feasibility; applications up to 10 kW that are complete in all respects are deemed accepted without a feasibility study, and any commensurate enhancement of the consumer's sanctioned load is to be carried out by the distribution licensee. Sub-regulation 8.12 becomes a commissioning deadline: once the consumer submits the installation certificate, the licensee must sign the connection agreement, install the meter and commission the system within fifteen days, and must place the formats of the connection agreement and installation certificate on its web portal.

Nothing else in the principal regulations is touched, and the notification contains no savings, transitional or repeal provision.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, New connections and load changes

Read with this

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document