Skip to content

CSERC · Chhattisgarh State Electricity Regulatory Commission

Intra-State Open Access in Chhattisgarh (Second Amendment) Regulations, 2023

Chhattisgarh State Electricity Regulatory Commission (Intra-State Open Access in Chhattisgarh) (Second Amendment) Regulations, 2023

AmendmentDated 26 Sep 2023In force from 1 Apr 2024104/CSERC/2023 dated 26th September 2023

Amends the Connectivity and Intra-State Open Access Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Chhattisgarh State Electricity Regulatory Commission's Second Amendment to its 2011 intra-state open access regulations, issued as Notification No. 104/CSERC/2023 and dated Raipur, 26 September 2023 (p2). It changes one thing only: the cross-subsidy-surcharge formula. Clause 2 substitutes Clause 33(6)(iii) of the Principal Regulations so that the surcharge is based on the current level of cross-subsidy of the consumer's tariff category/slab and/or voltage level, worked out by the average-cost method — the difference between the average tariff for that supply voltage for the subsidising category and the licensee's average cost of supply — subject to a ceiling of 20% of the adjusted average cost of supply for that year, with a worked illustration (p2). Clause 3 deletes Clauses 33(6)(iv) and (v) (p2). The amendment takes effect only from 1 April 2024 (p2), so the existing provisions continue through 2023–24. Page 1 carries the Hindi version.

Standard name
Open Access Regulations
Primary topics
Open access, Open access charges

Read with this

The regulation

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum not held as English text.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document