CSERC · Chhattisgarh State Electricity Regulatory Commission
Connectivity and Intra-State Open Access Regulations, 2011
Chhattisgarh State Electricity Regulatory Commission (Connectivity and Intra-State Open Access) Regulations, 2011
RegulationDated 4 Mar 2011No. 35/CSERC/2011 dated March 04, 2011
3 amendments to it are on Voltaic, the latest dated 18 Mar 2026.
Summary
Summary written by software, from pages 1 to 39 of 59. Check the regulator's original before you rely on it.
This is CSERC's principal 2011 regulation for connecting to the Chhattisgarh State grid and for using intra-State transmission and distribution systems under open access. It was issued in Raipur on 4 March 2011 as No. 35/CSERC/2011 and, on commencement, repeals the 2005 Chhattisgarh intra-State open access regulations (p1). It comes into force from the first day of the calendar month after publication in the Chhattisgarh Rajpatra.
Part 1 (pp2–5) sets the title, commencement and extent, and defines the building blocks: applicant, open access customer, long-term/medium-term/short-term open access, intra-State requester and user, bulk consumer, connectivity, nodal agency, allotted and reserve capacity, stranded capacity, interface meters, bilateral transaction and State grid. Part 2 (pp6–11) states the scope: open access for one MW and above, eligibility and disqualifications, continuation for existing entities on existing terms, criteria for granting long-term, medium-term and short-term access, relative allotment priority, and metering/interface requirements including main/check meters, data communication and defect assessment.
Part 3 (pp12–15) deals with connectivity to the STU, other transmission licensees and distribution licensees, including application procedure, interconnection studies, connection agreements and testing/infirm power. Table-1 covers connectivity application processing by applicant size and nodal agency (p15).
Part 4 (pp16–25) is the open access procedure: categories by injection/drawal location and duration; application requirements; nodal agency, application fee, documents and disposal timeframes in Tables 2–4 for LTOA, MTOA and STOA; and the licensee consent route, including deemed consent and affidavit mechanism when a licensee fails to respond.
Parts 5–7 then set out separate procedures for long-term (pp26–32), medium-term (pp33–36) and short-term (pp37–39) open access. LTOA covers application, bank guarantee, system studies, charge estimates, agreement types, renewal, relinquishment/stranded-capacity compensation and inter-State use. MTOA covers the application window, grant, agreement, exit and no renewal preference. STOA covers application, processing, day-ahead transactions and advance payment.
Read with this
Amendments and corrections
- Dated 17 Dec 2012Connectivity and Intra-State Open Access First Amendment Regulations, 2012
- Dated 26 Sep 2023Intra-State Open Access in Chhattisgarh (Second Amendment) Regulations, 2023
- Dated 23 Jan 2026Intra-State Open Access in Chhattisgarh Second Amendment Regulations, 2023 — Corrigendum
- Dated 18 Mar 2026Connectivity and Intra-State Open Access Regulations, 2011 — Third Amendment, 2026
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum not held as English text.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.