CSERC · Chhattisgarh State Electricity Regulatory Commission
Connectivity and Intra-State Open Access First Amendment Regulations, 2012
Chhattisgarh State Electricity Regulatory Commission (Connectivity and Intra-State Open Access) First Amendment- Regulations, 2012
AmendmentDated 17 Dec 2012In force from 1 Jan 2013No. 44/CSERC/2012 dated 17 December, 2012
Amends the Connectivity and Intra-State Open Access Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Chhattisgarh State Electricity Regulatory Commission amends its 2011 Connectivity and Intra-State Open Access Regulations through fourteen clauses, issued at Raipur on 17 December 2012 and brought into force from 1 January 2013 (p1). Almost everything it does concerns who may take open access, on what consents, and how the State grid is charged when it carries inter-State transactions.
Clauses 2–5 touch eligibility and charging: open access customers pay charges the Commission determines from time to time (p2); bulk consumers not connected through dedicated feeders are barred from open access unless the Commission exempts them in writing for recorded reasons, and bulk consumers taking open access remain subject to load restriction (p2); the requirement of separate metering equipment is deleted from the metering clause (p2); and applicants must file an undertaking or declaration that the same power is not contracted elsewhere (p2).
Clauses 6–10 deal with procedures and consents — the word "distribution" is dropped from two provisos (p2); for inter-State medium-term open access by a generator (including captive) or consumer connected to a non-STU transmission licensee or a distribution licensee, the STU/SLDC must obtain the affected licensee's consent before giving its own (p2–3); collective-transaction wording is struck out of the transaction clause (p3); and Clause 32 is replaced wholesale so that inter-State short-term open access follows CERC's 2008 inter-State open access regulations, with the licensee's concurrence needed only the first time and afresh after any break (p3–4).
Clauses 11–13 rewrite the charging mechanics for using the State grid for inter-State power: transmission charges shared on CTU-allotted capacity, wheeling charges computed on CTU-approved energy at 100% load factor for bilateral transactions, and short-term charges at rates the Commission specifies, keyed to RLDC/NLDC-approved energy (p4–5). The illustration in Table-5 is trimmed by deleting the distribution licensee wheeling charge in one injection/drawal case (p5).
Clause 14 rewrites the surrender clause: a short-term open access customer who surrenders unutilised capacity bears transmission/wheeling charges, cross-subsidy surcharge and other applicable charges on the original reserved capacity for two days, plus two days' SLDC operating charges, with a minimum two-day notice before cancellation or downward revision takes effect (p5–6).
Read with this
The regulation
- Dated 4 Mar 2011Connectivity and Intra-State Open Access Regulations, 2011
Amendments and corrections
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum not held as English text.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.