Gujarat Grid Interactive Battery Energy Storage System Regulations, 2026 — Draft

Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026

Draft regulationDated 12 May 2026

Draft

A proposal that has since been finalised as the Grid Interactive Battery Energy Storage System Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is GERC's draft Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026. It creates a state-wide framework for grid-interactive battery storage, from planning and procurement through scheduling, despatch, ancillary services and technical safety. It is made under the Electricity Act 2003, extends to Gujarat and is to come into force on publication in the State Official Gazette; the draft is signed 12.05.2026 and leaves the notification number and Gazette date blank (p1, p4, p20).

Chapter 1 (p4–8) sets definitions and scope. It applies to generating companies, transmission and distribution licensees, standalone BESS developers, captive generating plants, consumers/prosumers using net/gross metering, net billing, group or virtual net metering, and aggregators. All grid-connected BESS must register with GEDA, with an SOP to follow within three months; BESS already included in a new renewable project's registration is exempt. It lists objectives, including ESO compliance, and allows ownership by licensees, IPPs, CGPs, developers, consumers/prosumers and aggregators. Business models include co-located, standalone, network-embedded, net-metering and EV/V2G/G2V integration.

Chapter 2 (p9–13) covers planning, procurement and deployment. It sets a minimum project size of 1 MW with at least two hours duration at 11 kV or above, with carve-outs for DTR-level, captive and consumer arrangements. Procurement is preferably through competitive bidding under Section 63 and the MoP 10 March 2022 BESS guidelines; Section 62 procurement needs prior Commission approval in exceptional cases. Separate rules cover generation-linked, transmission-linked, distribution-linked and standalone BESS. Generation and captive plants may install only co-located BESS charged from the associated plant; third-party standalone storage may sell services or power.

Chapter 3 (p14–17) makes SLDC responsible for scheduling and despatch. Charging is treated as drawal and discharging as injection; co-located BESS is scheduled with its generating station. It requires SLDC procedures for co-located scheduling, transmission-linked cost/revenue pooling, and ancillary-service eligibility and settlement within set timelines. Ancillary services are contingent on future regulations. Multi-use projects must earmark capacity and separate revenues; SLDC may curtail or reschedule BESS for grid security.

Chapter 4 (p18) adopts CEA technical standards, real-time data reporting to SLDC, safety and cybersecurity norms, and Battery Waste Management Rules 2022 for disposal. Chapter 5 (p19–20) covers consumer/prosumer approvals and GEDA registration, aggregators, open access under the GERC 2011 and Green Energy Open Access 2024 regulations, CGRF/Commission dispute resolution, and Commission powers to direct, relax, amend and remove difficulties. Much operational detail is left to later SOPs and procedures.

Standard name
Energy Storage
Primary topics
Energy storage deployment, Power procurement and PPAs, Scheduling and despatch

Read with this

Commencement notices and reasons

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document