GERC · Gujarat Electricity Regulatory Commission
Grid Interactive Battery Energy Storage System Regulations, 2026 — Statement of Reasons
Statement of Reasons on Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026
Statement of reasonsDated 16 Oct 2026
The commission's reasons for the Grid Interactive Battery Energy Storage System Regulations, 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is the Statement of Reasons (SoR) of the Gujarat Electricity Regulatory Commission for the finalized Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026, signed at Gandhinagar on 16.10.2026 (p147). It is not the regulations themselves: it records why the Commission framed them, how stakeholders were consulted, what comments were received, and what the Commission finally decided, and it directs publication of the regulations in the Official Gazette after incorporating the changes indicated (p147).
The background and consultation chapters state that the Regulations are made under the Electricity Act, 2003, and refer to Ministry of Power BESS guidelines dated 11.03.2022, the National Framework for promoting Energy Storage in August 2023, and the GERC RPO Regulations, 2025 (pp1–2). They explain the need for storage to integrate infirm wind and solar and to provide ancillary and balancing services (p2). The draft Regulations were published on 12.05.2026, newspaper notices invited comments up to 15.06.2026, 20 stakeholders submitted written comments (Annexure-I, p148), and a public hearing was held on 15.06.2026 (Annexure-II, p149).
The main body works through the draft Regulations clause by clause, recording stakeholder suggestions and the Commission’s analysis and decision (pp4–136). It covers definitions such as RTE, solar/non-solar hours, aggregator, ancillary services, associated generating plant, BESS, prosumer and standalone BESS (pp4–15); scope and applicability, including a proviso for pre-notification BESS projects with a BESPA and GEDA registration, and GEDA’s registration and SOP duties (pp15–24); business models, including the restriction that co-located BESS charge only from the associated generating plant and the tariff treatment if grid charging occurs (pp24–38); planning, procurement and deployment for generation-linked, transmission-linked, distribution-linked and standalone BESS (pp38–81); scheduling, despatch, DSM and energy accounting for different BESS configurations, including SLDC override during grid disturbance and a 24-hour availability declaration for solar plus co-located BESS (pp81–107); ancillary services, multi-use revenue, curtailment, technical standards, safety, cybersecurity and environmental norms (pp107–123); consumers/prosumers and aggregators (pp123–131); and open access and dispute resolution (pp131–136).
The SoR then addresses additional proposals on source-based commercial treatment, RTE/loss accountability, performance guarantees, charge exemptions, Gujarat Integrated Renewable Energy Policy 2025 connectivity and security deposit issues, and solar energy consumption timing with BESS; the Commission adds a Regulation 15.2 allowing stored solar energy to be injected beyond the banking period with same-15-minute-block adjustment (pp136–145). It rejects the suggestion that separate BESS regulations are unnecessary (p146), directs gazette publication (p147), and annexes the stakeholder lists (pp148–149).
Read with this
The regulation
- Dated 16 Oct 2026Grid Interactive Battery Energy Storage System Regulations, 2026
Earlier drafts
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.