Skip to content

GERC · Gujarat Electricity Regulatory Commission

Grid Interactive Battery Energy Storage System Regulations, 2026

Gujarat Electricity Regulatory Commission (Grid Interactive Battery Energy Storage System) Regulations, 2026

RegulationDated 16 Oct 2026Published in the Gazette 16 Oct 2026GERC/2026/10/Tech/2146 dated 16.10.2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission issued these principal regulations in the Gujarat Government Gazette Extraordinary dated 16 October 2026 (p1). They establish a state-wide framework for grid-interactive battery energy storage systems — BESS — covering planning, procurement, development, deployment, operation, scheduling, despatch and utilisation (p3). They extend to the whole of Gujarat and come into force on Gazette publication (p1).

Chapter 1 and the opening regulations set definitions, scope, applicability, objectives, ownership and business models (p1–5). Eligible owners include generating companies, transmission and distribution licensees, IPPs, captive generating plants, renewable developers, independent storage providers, consumers/prosumers and aggregators (p4). BESS may be co-located with generation, standalone, embedded in transmission or distribution networks, installed under net metering/gross metering/net billing/group or virtual net metering, or integrated with EV charging and V2G/G2V services (p4). Grid-connected projects above a minimum size threshold and connection voltage must register with GEDA, which is to publish a detailed SOP (p3).

Regulations 7–11 specify planning, procurement and deployment principles for generation-linked, transmission-linked, distribution-linked and standalone BESS (p5–8). Procurement is mainly through competitive bidding under Section 63 with Commission adoption of the discovered tariff; Section 62 procurement is exceptional and requires prior approval (p5–6). Co-located BESS must be charged from the associated generating plant, and standalone BESS cannot serve captive or third-party-sale renewable projects (p4, p6, p8).

Regulations 12–18 cover operation, scheduling and despatch, SLDC control during grid disturbance, energy accounting and settlement, ancillary services, multi-use revenue stacking and curtailment (p8–12). SLDC has overriding despatch authority during grid disturbances and must prepare scheduling and pool-accounting procedures for transmission-linked BESS (p10). Regulation 15.2 overrides specified banking-period orders for certain solar-plus-BESS projects on a 15-minute block basis (p11).

Regulations 19–28 cover technical standards, safety, cyber security and battery disposal, consumer/prosumer and aggregator roles, open access, dispute resolution and the Commission's powers to direct, relax, amend and remove difficulties (p12–13). A list of abbreviations closes the document (p14).

Standard name
Energy Storage
Primary topics
Energy storage deployment, Power procurement and PPAs, Scheduling and despatch

Read with this

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document