AERC · Assam Electricity Regulatory Commission
Fuel and Power Purchase Price Adjustment Formula Regulations, 2010 — Amendment, 2012
Assam Electricity Regulatory Commission (Fuel and Power Purchase Price Adjustment Formula) Regulations, 2010, (Amendment) 2012
AmendmentDated 31 Mar 2012No. AERC. 28/2012 dated The 31st March, 2012
Replaced by Fuel and Power Purchase Price Adjustment Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Fuel and Power Purchase Price Adjustment Formula Regulations, 2010.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a notification of the Assam Electricity Regulatory Commission, dated 31 March 2012 (p1), issued as an amendment to the AERC Fuel and Power Purchase Price Adjustment Formula Regulations, 2010. Despite the 'amendment' label, it is set out as a complete regulation: it defines terms, states the FPPPA formula, and lays down how the charge is computed, levied and verified. It extends to the whole of Assam and comes into force on publication in the Assam Gazette — no Gazette date is printed (p1).
Regulation 2 explains the rationale: s.62(4) of the Electricity Act permits tariff changes outside the annual cycle where a fuel surcharge formula exists, and uncontrollable costs — fuel price, inflation, power purchase unit cost including hydrothermal mix — should be recovered speedily so future consumers are not burdened (p2). Regulation 3 defines Act, Commission, Generating Company, Licensee, Tariff, Unscheduled Interchange, Year/Current/Previous/Ensuing Year and State (p2).
Regulation 4 is the operative core: the incremental cost V = VF + VPP, converted into an FPPPA recovery rate in paise/kWh over energy sales, defined as metered sales, assessed unmetered sales, deemed sale from excess T&D losses, less sales to exempted consumer categories (p3). It gives separate normative-parameter computations for coal-based stations (coal and oil quantities from station heat rate, calorific value, auxiliary consumption, transit loss) and gas-based stations, plus the power purchase differential on approved versus actual rates (p3–5).
Regulation 5 governs implementation: recovery as an incremental energy charge on the bill, a ceiling of 25% of the variable component of tariff, a quarterly control period with the surcharge charged from the first month of the next quarter, mandatory quarterly filings and annual audited reconciliation, a 5% variation threshold for power procurement needing prior approval, treatment of prior period expenses, merit-order breach costs borne by the licensee, refund mechanics, and a quarterly verification fee (p5–7).
Regulation 6 gives the regulations overriding effect over four named AERC regulations; Regulations 7–11 cover removal of difficulties, directions, inherent powers, amendment and interpretation (p7–8). The notification is signed by the Secretary of the Commission (p8).
Read with this
The regulation
- Dated 28 Dec 2010Fuel and Power Purchase Price Adjustment Formula Regulations, 2010
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.