AERC · Assam Electricity Regulatory Commission

Fuel and Power Purchase Price Adjustment Formula Regulations, 2010 — Amendment, 2012

Assam Electricity Regulatory Commission (Fuel and Power Purchase Price Adjustment Formula) Regulations, 2010, (Amendment) 2012

AmendmentDated 31 Mar 2012No. AERC. 28/2012 dated The 31st March, 2012

Replaced by Fuel and Power Purchase Price Adjustment Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Fuel and Power Purchase Price Adjustment Formula Regulations, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a notification of the Assam Electricity Regulatory Commission, dated 31 March 2012 (p1), issued as an amendment to the AERC Fuel and Power Purchase Price Adjustment Formula Regulations, 2010. Despite the 'amendment' label, it is set out as a complete regulation: it defines terms, states the FPPPA formula, and lays down how the charge is computed, levied and verified. It extends to the whole of Assam and comes into force on publication in the Assam Gazette — no Gazette date is printed (p1).

Regulation 2 explains the rationale: s.62(4) of the Electricity Act permits tariff changes outside the annual cycle where a fuel surcharge formula exists, and uncontrollable costs — fuel price, inflation, power purchase unit cost including hydrothermal mix — should be recovered speedily so future consumers are not burdened (p2). Regulation 3 defines Act, Commission, Generating Company, Licensee, Tariff, Unscheduled Interchange, Year/Current/Previous/Ensuing Year and State (p2).

Regulation 4 is the operative core: the incremental cost V = VF + VPP, converted into an FPPPA recovery rate in paise/kWh over energy sales, defined as metered sales, assessed unmetered sales, deemed sale from excess T&D losses, less sales to exempted consumer categories (p3). It gives separate normative-parameter computations for coal-based stations (coal and oil quantities from station heat rate, calorific value, auxiliary consumption, transit loss) and gas-based stations, plus the power purchase differential on approved versus actual rates (p3–5).

Regulation 5 governs implementation: recovery as an incremental energy charge on the bill, a ceiling of 25% of the variable component of tariff, a quarterly control period with the surcharge charged from the first month of the next quarter, mandatory quarterly filings and annual audited reconciliation, a 5% variation threshold for power procurement needing prior approval, treatment of prior period expenses, merit-order breach costs borne by the licensee, refund mechanics, and a quarterly verification fee (p5–7).

Regulation 6 gives the regulations overriding effect over four named AERC regulations; Regulations 7–11 cover removal of difficulties, directions, inherent powers, amendment and interpretation (p7–8). The notification is signed by the Secretary of the Commission (p8).

Standard name
Fuel and Power Purchase Cost Adjustment
Primary topics
Fuel and power purchase cost adjustment, Power procurement and PPAs, Losses and loss reduction

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document