AERC · Assam Electricity Regulatory Commission
Fuel and Power Purchase Price Adjustment Formula Regulations, 2010
Assam Electricity Regulatory Commission (Fuel and Power Purchase Price Adjustment Formula) Regulations, 2010
RegulationDated 28 Dec 2010No. AERC.23/2010 dated The 28th December, 2010
Replaced by Fuel and Power Purchase Price Adjustment Regulations, 2024
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Assam Electricity Regulatory Commission issued these regulations on 28 December 2010 to create a standing quarterly fuel surcharge mechanism for the state's distribution licensee, so that changes in fuel and power purchase cost can be passed through without a fresh tariff proceeding (p1–2).
Regulation 1 gives the title, extends the regulations to the whole of Assam and brings them into force from the date of publication in the Assam Gazette — that Gazette date is not printed anywhere in the text (p1). Regulation 2 sets out the rationale: section 62(4) of the Electricity Act 2003 permits tariff changes outside the annual cycle where a fuel surcharge formula is specified, and both the central Tariff Policy and the AERC Tariff Regulations, 2006 call for speedy recovery of uncontrollable costs such as fuel and power purchase price variations (p1–2). Regulation 3 defines the terms used, including the financial-year concepts of current, previous and ensuing year (p2).
Regulation 4 is the operative core. It splits the incremental cost into a fuel component and a power purchase component, and divides that total by an energy sales base to give the recovery rate. It then spells out, station by station, how the coal and oil quantities for coal-based stations and the gas quantity for gas-based stations are to be derived from approved operating parameters, and how the power purchase differential is computed (p3–5).
Regulation 5 governs implementation: recovery as an incremental energy charge on the consumer bill, a ceiling of 25% of the variable component of tariff with a petition route above that ceiling, quarterly application without regulatory proceedings, mandatory publication of the computations and charges, a quarterly filing deadline with forfeiture of claims for default, prior Commission approval for power procurement variations beyond a stated threshold (with a fuel-price carve-out), a verification fee, and refund or recovery of the difference as approved (p5–7). Regulation 6 gives the regulations overriding effect over four other AERC regulations; regulations 7 to 11 deal with removal of difficulties, orders and practice directions, inherent powers, amendment and interpretation (p7–8).
Read with this
Amendments and corrections
Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.