Skip to content

CERC · Central Electricity Regulatory Commission

Appointment of Consultants Regulations, 2008

Central Electricity Regulatory Commission (Appointment of Consultants) Regulations, 2008

Regulation · Gazette copyDated 6 Oct 2008Published in the Gazette 14 Oct 2008No. L-7/1/0844(159)-CERC. dated the 6th October, 2008

The Gazette copy of the Appointment of Consultants Regulations, 2008.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, self-contained CERC regulation governing how the Commission hires outside help — consultants, individual experts and professional advisers. It was notified on 6 October 2008 (p6) under s.178 of the Electricity Act, 2003 and, by its own commencement clause, took effect on publication in the Official Gazette, which the cover page prints as 14 October 2008 (p1, p6).

Regulations 1–2 give the title, commencement and six definitions, the central one being a broad definition of "Consultant" as any individual, firm, body or association not in the Commission's employment who has specialised knowledge, experience or skill (p6). Regulation 3 limits the use of consultants: routine day-to-day work that in-house staff can do is excluded, and engagement is allowed for expert advice, studies and benchmarking, or tasks where outside help is deemed more efficacious on quality, cost or time (p6–7). Regulation 4 caps any engagement at a continuous period of three years (p7).

Most of the document is procurement procedure. Regulation 5 splits consultants into corporate consultants, individual consultants and professional experts (p7). Regulation 6 handles corporate consultants: terms of reference drafted by the Secretariat, a Consultancy Evaluation Committee (CEC) constituted by the Chairperson, evaluation weightages skewed to the technical proposal, single-stage two-envelope bidding advertised in a newspaper and on the website with a stated minimum notice period, a quality-and-cost based evaluation, a minimum number of valid bids, and an exception permitting single sourcing in urgent cases up to a monetary ceiling (p7–8). Regulation 7 covers individual consultants: a CEC headed by a Commission Member, an advertised call for applications, merit-ranking through marks and interview, a minimum number of candidates to be considered, and the three fee components payable (p8–9). Regulation 8 lets the Chairperson engage a professional expert urgently, from a shortlist prepared by the Secretariat, subject to a fee ceiling per item of work (p9).

Regulation 9 lets the senior-most Member exercise the Chairperson's powers during a vacancy (p9). Regulation 10 repeals the 1999 Consultants Regulations from the date these commence, with a savings clause deeming past acts done under the repealed regulations (p9).

Standard name
Appointment of Consultants

Read with this

The regulation

Commencement notices and reasons

Other copies of these documents (3)

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document